Tag: US 169B

  • KDOT Lettings: June 2026

    There are two big-ticket items up for bid on June 17 Federal-Aid: 98 TE 0535-01: Sidewalk installation on Main Street from Railroad Avenue to Warren Avenue, Russell Avenue from 4th to 6th, the south side of Warren Avenue from Main Street East 1/2 block, and the North Side of Railroad Avenue from Main Street west…

  • KDOT Lettings: February 2024

    Awarded bids announced on March 8 are highlighed in red. Federal-Aid: 35-46 KA 7190-01: PCCP Patching and 4-inch HMA overlay on Southbound I-35 from I-635 to 95th Street, including the exit ramps to Shawnee Mission Parkway and Antioch. PCCP patching (no overlay) on the exit ramps to 67th and Johnson Drive. Superior Bowen Asphalt Company…