KDOT Lettings: January 2024

Awarded bids announced on February 7 are highlighted in red

Federal-Aid:

7-22 KA 5722-01: Replacement of Bridge #016 over Mill Creek on K-7 southeast of White Cloud. One lane of traffic to be maintained, controlled by signals.

52 N 0733-01: Construct new trails along Parallel Road and 158th Street in Baeshor.
52 N 0734-01: Reconstruct 155th Street in Basehor from US 24 to Elm Street, including a roundabout at Parallel.
Miles Excavating, Inc., Basehor, $13,163,024.83.

24-81 KA 6851-01: Lighting upgrades at the east junction of US 24 with US 77 east of Riley. Phillips Southern Electric Company Inc., Wichita, Kansas, $65,669.00.

99-99 KA 2603-03: Reconstruction of K-99 from I-70 north 2 miles. Moved to February lettings

183Y-26 KA 5608-01: Reconstruction of US 183 Bypass/230th Avenue from Frontier Road to 55th Street, including a new bridge over I-70. Wildcat Construction Co Inc & Subsidiaries, Wichita, $20,914,187.10.

283-98 KA 7171-01: Ultra thin bonded asphalt surface from the Ness/Trego County Line to I-70. Venture Corporation, Great Bend, $3,710,366.70.

27-100 KA 5739-01: Replacement of the North Fork Ladder Creek Bridge (010) located 4.75 miles north of the Wallace/Greeley County Line. King Construction Company Inc & Subsidiaries, Hesston, $3,599,743.21.

160-50 KA 7124-01/160-11 KA 7125-01: Ultra thin bonded asphalt surfacing from the east city limits of Oswego in Labette County to US 69 in Cherokee County (Labette County segment is non-FA) Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $2,073,632.10.

54-87 KA 6935-01: Bridge repair on three bridges at the I-135/Kellogg interchange in Wichita: Bridge 303 over Hydraulic on the combined NB/SB ramp from I-135 to WB Kellogg; Bridge 304 over I-135 and the canal on the ramp from EB Kellogg to NB 135; and Bridge 306 over I-135 and the canal on the ramp from WB Kellogg to SB I-135. Wildcat, $1,348,537.60

34-13 KA 5744-01: Replace the K-34 bridge over Bluff Creek north of Sitka. Traffic to be detoured via US 160, US 283, and US 54. L & M Contractors Inc., Great Bend, $3,378,514.55.

Non-FA:

73-52 KA 7131-01: Ultra thin bonded asphalt surface from the Seven Mile Creek bridge in Lancing to the intesection with Limit Street in Leavenworth. Ideker Incorporated, Saint Joseph, Missouri, $2,216,347.57

40B-31 KA 6772-01: Bridge repair on the Smoky Hill River Bridge in Grandview Plaza. PCI Roads, LLC, Saint Michael, Minnesota, $249,240.22.

70-85 KA 7207-01: Full-depth concrete patching on I-70 from Niles Road to the Saline/Dickinson County Line. Interstate Improvement Inc., Faribault, Minnesota, $1,785,494.50.

169-2 KA 7248-01: Crack sealing from ~ 1.5 miles south of the south junction with US 59 northeast of Welda to the roundabout at the north junction with US 59 south of Garnett. Pavement Pro’s LLC, McPherson, $136,072.60.

281-4 KA 6953-01: Bridge repair on bridge #042 over Brush Creek south of Medicine Lodge. Wildcat, $12,182.00.

160-4 KA 6955-01: Bridge repair over Elm Creek east of Medicine Lodge. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $613,128.91.

23-35 KA 7084-01: 1-inch milling and 2-inch HMA overlay from US 56 to Cimarron. Venture, $2,867,507.55.


Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *