KDOT Lettings: August 2025

There are 31 lettings across 28 projects up for bids on August 20. Awarded Bids announced on September 8 are highlighted in red. One awarded bid announced on October 7 is highlighted in blue.

Federal-Aid:

(unless otherwise noted)

135-59 KA 7282-01: Lighting upgrades at the Northbound and Southbound rest areas on I-135 north of McPherson. Jon Fulsom Construction LLC, Wellington, $294,529.94

24-33 KA 7744-01: 2-inch milling and 2-inch HMA overlay on US 24 from the Sheridan/Graham County Line to the East City Limits of Hill City
84-33 KA 7746-01: 1/2-inch milling and 1.5-inch HMA overlay on the entire length of K-84 [Non-FA]
85-33 KA 7745-01: 1/2-inch milling and 1.5-inch HMA overlay on the entire length of K-85 [Non-FA]
Venture Corporation, Great Bend, $4,430,024.95.

69 C 5285-01: Replace Road BB bridge over the North Fork Solomon River east of Lenora. Reece Construction Company, Inc., Salina, $463,107.28.

24-82 KA 7743-01: Surface Recycle and Chip Seal on US 24 from the Graham/Rooks County Line to Stockton. Dustrol Inc., Towanda, $2,978,047.88.

90 C 5298-01: Replace the bridge on County Road 125E over the Saline River in southeast Sheridan County. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $870,613.20.

19 C 5295-01: Replace the bridge on 690th Avenue over a Tributary to Little Walnut Creek

900-8 KA 6474-01: Replace the bridge on East 12th Avenue over the Walnut River in El Dorado Lake State Park. A M Cohron and Son Inc., Atlantic, Iowa, $3,188,623.42.

54-48 KA 7718-01: 2-inch milling and 2-inch HMA overlay on US 54 from 1 mile west of K-11 to Kingman. APAC-Kansas Inc. Shears Division, Hutchinson, $1,181,785.72.

61-78 KA 7711-01: 1.5-inch milling and 2-inch HMA overlay on K-61 from Arlington to US 50. APAC-Kansas, $2,049,899.77.

50-78 KA 7748-01 1.5-inch Overlay on US 50 from Sego Road to K-61. APAC-Kansas, $2,164,249.17.

14-78 KA 7768-01/14-48 KA 7769-01: 1-inch milling and 1.5-inch HMA overlay on K-14 from US 54 to K-96 (the former K-17) [Kingman County segment is non-FA]. APAC-Kansas, $3,364,436.40.

29 TE 0513-01: Construct a new path along Commanche Street from 1st Avenue to Avenue P in Dodge City. Building Solutions LLC, Dodge City, $1,193,321.70.

83-106 KA 6234-02: ITS upgrades along US 83 in Finney, Scott, Logan, and Thomas Counties. Phillips Southern Electric Company Inc., Wichita, $2,577,500.00.

Federal Aid, Local Projects

27 C 5249-01: Major Collector signage upgrade in Ellsworth county north and west of K-156

26 C 5261-01: Signing and pavement marking upgrades on several roads in Ellis County. C-HAWKK Construction LLC, Eudora, $324,435.27.

Non-FA:

106 KA 7579-01: Sidewalk ramp updates in Hope, Summerfield, and Beattie. PSE Contractors LLC, Wichita, $241,870.00.

106 KA 7817-01: Mudjacking at various locations in KDOT District 1. Raising Solutions LLC, Jefferson City, Missouri, $1,205,345.00.

25-55 KA 7760-01: Chip Seal on K-25 from the Wichita/Logan County Line to MP 145.9. Heft and Sons LLC, Greensburg, $490,513.60.

24-90 KA 7759-01: Chip Seal on US 24 in Sheridan County. Heft and Sons, $1,302,536.00.

24-90 KA 7765-01: 2-inch mill and 2-inch pavement patching on US 24 in Hoxie. Bettis Asphalt & Construction Inc., Topeka, Kansas, $117,946.00.

9-106 KA 7756-01: Chip Seal on K-9 from US 183 to US 281 in Phillips and Smith Counties. Heft and Sons, $1,008,974.00.

99-37 KA 6761-01: Replace a drainage culvert at MP 67.6

106 KA 7805-01: Rumble strip milling on US 166 from 0.9 miles west of US 400 to 0.6 miles west of the Missouri State Line, US 69 from K-47 to 680th Avenue, and US 169 from 3 miles north of K-47 to Iola

54-8 KA 7804-01: Crack Sealing on US 54 from El Dorado to the Butler/Greenwood County Line. Pavement Pros LLC, McPherson, $77,352.26.

54-106 KA 7761-01: PCCP patching on US 54 from SE 50th Avenue to the Pratt/Kingman County Line. Iowa Civil Contracting Inc., Victor, Iowa, $1,693,270.00.

50-78 KA 6053-02: Reconstruct a short section of US 50 near Brady Lake Road. One lane of traffic to be carried through controlled by signals. Pearson Construction LLC, Wichita, $3,393,829.16.

251-87 KA 7720-01: 1-inch milling and 1.5-inch HMA overlay on the entire length of K-251. Pearson, $808,257.33.

42-106 KA 7698-01: Crack Sealing on K-42 from US 281 to K-14 in Pratt, Barber, and Kingman Counties. Pavement Pros, $235,160.66.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *