Categories
highways

KDOT Lettings: April 2023

There are 17 projects up for bidding on April 19.

Federal-Aid:

73-03 KA 3889-01: Replace bridge #014 over the Walnut Creek Drainage 4.55 miles northwest of the Thomas Road (former K-74) intersection. One-lane traffic through the work zone controlled by a temporary traffic signal.

77-58 KA 3923-01: Replace the bridge over Fawn creek on US 77/K-9 and reconstruct the east approach. One-lane traffic through the work zone controlled by a temporary traffic signal.

27 TE 0492-01: Construct a new Pedestrian/Bike Path along the west side of Grand Avenue (K-14) between Grace Avenue and the Smoky Hill River bridge.

36-77 KA 5987-01: Grading and surfacing on Grant Steet between 5th and 7th in Atwood. (no plans)

40-100 KA 3914-01: Replace the South Fork Smoky Hill River bridge between Sharon Springs and Wallace.;

40-100 KA 3916-01: Replace the bridge over the Union Pacific Limon Subdivision between Weskan and Sharon Springs. Detour via K-27, I-70, and US 385, though local traffic will be diverted onto old US 40 into Sharon Springs.

40-100 KA 4067-01: Replace the bridge over the Union Pacific Sharon Springs Subdivision west of Wallace. Traffic to be carried on a shoe-fly detour

69-11 KA 6619-01/400-11 KA 6620-01: 1/2-inch milling and 1.5-inch Overlay on US 69A/US 400 from K-66 north to US 69-160 and continuing north on US 69-160-400 to K-171. (US 69A segment is non-FA)

15-87 KA 5793-01: Upgrade of the traffic signals at Southeast Boulevard and 31st Street in Wichita

Federal-Aid, Local Projects:

16 C 5074-01: Replace a wood bridge on a driveway off of old US 50 about 1 1/2 mile east of Old Beto Junction.

30 C 5114-01: Replace the Osborne Road bridge over Eight Mile Creek

87 N 0738-01: Repair the Zoo Boulevard bridge over the Big Ditch in Wichita

Non-FA:

106 KA 6913-01: Mudjacking work in KDOT District 1

23-32 KA 6904-01: Patching on K-23 between MM 136-139 in Gove County

70-98 KA 6859-01: Lighting upgrades at the I-70 Rest areas east of WaKenney

15-87 KA 6903-01: HMA Patching and a 2-inch overlay on the east Frontage Road of Southeast Boulevard from 47th Street to Clifton Avenue in Wichita.

Categories
highways

KDOT Lettings, February 2023

There are only 11 projects up for bids on February 15. Approved Bids announced on February 27 are highlighted in red.

Federal-Aid:

9-66 KA 3885-01: Replace Bridge #016 over Spring Creek Drainage west of Wetmore. Detour via K-62, K-16, and US 75. Ebert Construction Co Inc & Subsidiary, Wamego, $1,158,262.25.

77-81 KA 3922-01: Replace bridge #039 over Mill Creek 1.57 miles north of the North Junction with US 24 (no plans posted) King Construction Company Inc. & Subsidiaries, Hesston, $2,239,342.05.

156-27 KA 3939-01: Replacement of the K-156 Bridge #026 over Oak Creek located 1.13 miles northeast of K-140. Detour via K-140 and K-111. King, $1,998,650.60.

11 U 2401-01: Sidewalk upgrade on Country Road from High School Avenue to Kansas Avenue and Maple Street from Tennessee Avenue to East Avenue in Columbus

50-24 KA 5779-01: Rehabilitation of a passing lane area on US 50-56 between Kinsley and Offerle
50-29 KA 3234-02: Rehabilitation of a passing lane area on US 50-56 near 119th Road in Ford County.
50-29 KA 5780-01: Rehabilitation of a passing lane area on US 50-56 east of Spearville.
Venture Corporation, Great Bend, $19,374,340.49.

Federal-Aid, Local Projects:

22 C 4999-01: Replace the 195th Road/Old US 36 bridge over Peters Creek east of Troy. Re-let from November 2022. B & B Bridge Company LLC, St. Paul, Kansas, $819,993.00.

56 C 5145-01: Replace the J Road bridge over Troublesome Creek north of Emporia.

Non-FA:

54-104 KA 6458-01: Upgrade a guard fence on a Culvert just west of Yates Center. Rubick Construction Inc., Williamsburg, $186,684.96.

56-73 KA 6454-01: Guardrail upgrades northeast of Garfield. J & J Contractors Inc., Iola, $393,457.27.

Categories
highways

KDOT Lettings: January 2023

There are 23 projects up for bids on January 18. Awarded bids announced on January 26 are highlighted in red. Awarded bids announced on February 27 are highlighted in blue.

Categories
highways

KDOT Lettings: March 2023

There are 17 projects up for bidding on March 22

Federal Aid (Unless noted):

10-46 KA 6651-02: Repair and overlay on the eastbound K-10 bridge over Kill Creek in Desoto. A new sign is part of the project – which maintains an existing redundancy “Kill Creek Creek.”

16-52 KA-5520-01: Reconstruction of the intersection of K-16 and Parallel Road (former K-90). Detour via US 59 and US 24.

470-89 KA 6733-01: Repair the I-470 bridges over 29th, Fairlawn, Gage, 37th, and Shunganunga Creek
75-89 KA 6739-01 Repair of the bridge carrying the ramp from westbound I-470 to eastbound I-70 [which is considered part of the US 75 main line] over SW 10th Street (non-FA)

50-106 KA 5787-01: Refurbishment of a Passing lane area between Walton and Peabody in Harvey and Marion Counties.

9-69 KA 3935-01: Replacement of the K-9 bridge (#052) over Scull Creek 3.97 miles east of the K-173 junction.
9-74 KA 3934-01: Replacement of the K-9 bridge (#033) over Crooked Creek, located 3.63 miles east of the Norton County Line.
9-74 KA 3962-01: Replacement of the K-9 Bridge (#034) over Wolf Creek, located 7.58 miles east of the Norton County Line.
The three bridge projects are tied together. K-9 is to be closed at the Scull Creek and Crooked Creek projects, with traffic detoured using US 283, US 36, and US 183. Traffic on the Wolf Creek project is to be carried through on a shoo-fly detour.

50-40 KA 5786-01: Construction of the westerly extension of the existing passing lane section of US-50 from 6.8 miles east of the I-135/US-50 junction east for 0.63 miles.

56-41 KA 5997-01: Reconstruction of La Lande Avenue from Pike Street to Inman Street in Sublette

Federal-Aid, Local Projects:

52 C-5144-01: Replace the Fairmount Road bridge over Little Stranger Creek.

89 C 5147-01: Replace the NW 66th Street over Indian Creek in Northern Shawnee County

37 C 5073-01: Replace the bridge on M Road over Tadpole Creek.

Non-FA:

70-84 KA 6858-01: Lighting upgrade on the I-70 rest area east of Russell

14-78 KA 1007-04/14-80 KA 1007-05: Milling, HMA Overlay, and bridge repair on the existing K-14/K-96 alignment between Hutchinson and Sterling in preparation for turnback when the new “Northwest Passage” alignment opens.

54-87 KA 6894-01: Repair of the 383rd Street bridge over US 54/400 in western Sedgwick County.

Categories
highways

KDOT Lettings: February 2022

25 projects are up for bids at KDOT on February 16. The approved bids announced on March 2 are highlighted in red.The approved bids announced on March 31 are highlighted in blue.

Categories
highways

KDOT Lettings: December 2021

43 projects are up for bids at KDOT on December 15, including two major projects on US 50 around Dodge City and into the territory out west. Awarded bids announced on December 28 are highlighted in red. Awarded bids announced on January 27 are highlighted in blue.

Categories
highways

KDOT Lettings, November 2021

There are a total of 42 projects up for bidding in the November KDOT lettings. Approved bids announced on December 14 are highlighted in red.

Categories
highways

KDOT Lettings: May 2021

The May project lettings mostly consist of maintenance projects, with a few bridge replacements.

This post has been updated to reflect the approved bidders and the bid amount as announced in press releases on June 10 and June 22. The approved bids announced on June 10 will be noted in red. The approved bids announced on June 22 will be noted in blue.

Categories
highways

KDOT Lettings: January 2021

The inauguration of President-elect Biden is not the only thing scheduled for January 20. It will also be the scheduled day for the monthly KDOT lettings. Included in the January lettings are several bridge replacements and signage upgrades, as well as a new roundabout in Kansas City.

This post has been updated to reflect the approved bidders and the bid amount as announced by KDOT in releases on February 5. The approved bids announced on February 5 will be noted in red.

Categories
highways

KDOT Lettings: November 2020

The November highway lettings mainly consist of maintenance projects, along with a couple of bridge replacements.

This post has been updated to reflect the approved bidders and the bid amount as announced by KDOT in a release on December 10. The approved bids announced on November 5 will be noted in red.