KDOT Lettings: October 2025

There aren’t any big-ticket projects up for bids in the KDOT October lettings, but there are 49 projects in Total. Awarded bids announced on November 12 are highlighted in red.

Federal-Aid:

52 TE 0524-01: Storm sewer reconstruction and overlay on Vilas Street in Leavenworth from 22nd Street to 10th Avenue. Linaweaver Construction Inc., Lansing, $1,755,438.70.

99-56 KA 7783-01: 1/2-inch milling and 1.5-inch HMA overlay on K-99 from I-35 to K-170. Pearson Construction LLC, Wichita, $2,088,469.85.

63-75 KA 5704-01: Replace bridges on K-63 over Bartlett Creek and the Union Pacific Kansas Sub near Emmett. New bridges to be built adjacent to the existing bridges, and the roadway will be realigned. Hawkins Construction Company, Omaha, Nebraska, $12,953,621.84.

75 N 0816-01: Sidewalk reconstruction on 6th and 8th Streets between Oak and Plum Streets and installation of RRFB pedestrian signals on Kaw Valley Road at 15th and 17th Streets in Wamego

113-81 KA 7731-01: 2-inch milling and 2-inch HMA overlay on Seth Child Road from Allison Street to US 24 in Manhattan
24-81 KA 7862-01: 1.5-inch milling and 1.5-inch HMA overlay on Tuttle Creek Boulevard from the Manhattan Water Treatment Plant to Fort Riley Boulevard/Poyntz (non-FA)
18-81 KA 7864-01: 2-inch milling and 2-inch HMA overlay on Fort Riley Boulevard from MP 188 to Richards Drive (non-FA)
Shilling Construction Co. Inc., Manhattan, $8,542,094.86.

99-99 KA 7784-01/99-56 KA 7856-01: 1-inch milling and 1.5-inch HMA overlay on K-99 from US 56 near Admire to K-4 in Eskridge in Lyon and Wabaunsee Counties (Lyon County segment is non-FA)
Pearson, $2,188,968.70

105 N 0803-01: Construct NE KCK Heritage Trail along 3rd Street from Minnesota Avenue to New Jersey Street. 3rd Street to be narrowed. Kansas Heavy Construction LLC, Shawnee, Kansas, $984,236.15.

24-15 KA 5750-01: Replace the bridge over a drainage tributary to Cris Creek west of 60th Road, reconstruct the intersection of US 24 and 60th Road, and replace the bridge over Cris Creek, all east of Glasco. Traffic to be carried over a shoo-fly detour. Reece Construction Company, Inc., Salina, $4,125,059.66.

26 TE 0511-01: Construct a new pedestrian path from 41st and Hall Street to the Sternberg Museum in Hays. East of Vine Street, the new path would run along the south side of I-70.

77-31 KA 7734-01: 1/2-inch milling and 1.5-inch HMA overlay on US 77 from I-70 to the Geary/Riley County Line. Shilling, $4,885,188.50.

14-45 KA 6470-01: Replace the K-14 bridge over Middle Buffalo Creek north of Jewell. Traffic to be carried on a shoo-fly detour. L & M Contractors Inc., Great Bend, Kansas, $2,972,513.46.

85 KA 7506-01: Install four EV Charging stations at Rolling Hills Zoo in Salina. DF Osborne Construction Inc., Topeka, Kansas, $99,887.76.

77 C 5256-01: Major Collector Signage update in Rawlins County west of K-25. There are intersections where Stop controls are being ‘downgraded’ to Yield control. Some curves also have their advisory speeds reevaluated. Hamm Contracting LLC, Marion, South Dakota, $240,664.75.

18-82 KA 7721-01: 4-inch milling, 3-inch inlay, and 1-inch HMA overlay on K-18 from the Graham-Rooks County Line to Road 5. Bettis Asphalt & Construction Inc., Topeka, Kansas, $3,423,020.15.

160-4 KA 7192-01: Improvements to the Memorial Peace Park and associated tourist kiosk improvements in Medicine Lodge. Prado Construction LLC, Valley Center, $1,071,520.00.

8 N 0756-01: Reconstruct Butler Road from Rosewood to 155th Street in Rose Hill. Pearson, $6,912,885.75.

14-39 KA 7781-01/14-48 KA 7782-01: 1.5-inch milling and 1.5-inch HMA overlay from US 160 to K-42 in Harper and Kingman Counties (Kingman County is Non-FA) Pearson, $2,246,359.11.

40 TE 0520-01: Safe Routes to School Sidewalk Improvements on 6th, Santa Fe, and Chestnut Streets in Halstead

56-73 KA 5753-01: Replace the Pawnee River bridge southwest of Larned. Detour via K-156 and US 183. Bridges Inc., Newton, $2,327,959.90.

87 N 0815-01: Construct new multi-use path on Seneca Street from Ford Street to 5th Street in Valley Center. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $343,746.00.

54-13 KA 7739-01: 1/2-inch milling and 2-inch HMA overlay on US 54 in Clark County, excluding the segment in Minneola. Venture Corporation, Great Bend, $3,126,724.18.

Federal-Aid, Local Projects:

90 C 5259-01: Collector signage upgrade in Sherican County

11 C 5263-01: Major collector signage upgrade in Cherokee County west of K-7

19 C 5244-01: Shoulder Grading on 200th Street from 4th Street to 570th Avenue. B & B Bridge Company LLC, St Paul, Kansas, $81,662.94.

18 C 5246-01: Erosion control on a major collector on the southwest side of Arkansas City

28 C 5247-01: Erosion control and overlay on Maple Street just southwest of Garden City

47 C 5258-01: Major collector signage upgrade in Karney County. Sign-Up Ltd DBA Haren’s Trees and Critters, Webster City, Iowa, $177,240.15.

Non-FA:

106 KA 6864-01: ITS upgrades, including new cameras and permanent and semi-permanent DMS around Garden City, Manhattan, Wichita, and Pittsburg. Phillips Southern Electric Company Inc., Wichita, $1,240,822.00.

24-15 KA 7828-01: Chip Seal on US 24 between US 81 and the Cloud/Clay County Line. Vance Brothers LLC, Kansas City, Missouri, $687,378.06.

18-21 KA 7619-01: Bridge repair on K-18 over Chapman Creek north of Chapman. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $263,759.21.

57-31 KA 7735-01: 1/2-inch milling and 1.5-inch HMA overlay on K-57 from the North City Limits of Junction City to US 77. Millings from the adjacent US 77 project [77-31 KA-7734-01] is anticipated to be recycled into the HMA on this project.
APAC-Kansas Inc. Shears Division, Hutchinson, $527,004.50.

28-45 KA 7821-01/148-45 KA 7822-01/148-79 KA 7823-01: 2-inch surface recycle and chip seal on K-28 from K-14 to K-148 and K-148 from K-28 to US 81 in Jewell and Republic Counties.
Dustrol Inc., Towanda, $4,171,686.40.

81-106 KA 5584-01: New Fiber circuit along US 81 from I-70 north to the Kansas/Nebraska State Line in Saline, Ottawa, Cloud, and Republic Counties. Phillips Southern, $8,128,453.00.

106 KA 7829-01: Chip Seal on US 24 from K-194 to US 81, and the entire length of K-193 and K-194. Vance Brothers, $768,598.70.

36-69 KA 7787-01: 1-inch milling and 2-inch HMA overlay on US 36 from Norton to the Norton/Phillips County Line. Bettis, $3,409,956.12.

36-74 KA 7788-01: 2-inch milling and 2-inch HMA overlay on US 36 from Phillipsburg to the Phillips/Smith County Line. Venture, $3,184,468.76.

183-74 KA 7789-01: 1-inch milling and 2-inch HMA overlay on US 183 from Phillipsburg to the Kansas/Nebraska State Line. Venture, $4,290,554.32.

9-92 KA 5393-01: Stream bank stabilization on Beaver Creek alongside K-9 west of Gaylord. Ebert Construction Co Inc & Subsidiary, Wamego, $401,807.25.

70-97 KA 7445-02: Guardrail updates on I-70 in Thomas County. J & J Contractors Inc., Iola, x$1,999,132.70.

75-104 KA 7611-01: Bridge repair on Owl Creek north of Yates Center. B & B Bridge, $562,074.62.

15-87 KA 6285-01: Traffic Signal replacement on Southeast Boulevard at Meadowlark Boulevard, 47th Street, and McArthur Road. FYA at 47th Street. Phillips Southern, $1,752,465.00.

42-106 KA 7736-01: 1.5-inch milling and 1.5-inch HMA overlay on K-42 from K-2 in Sumner County to 71st Street in Sedgwick County. Pearson, $2,518,486.18.

49-96 KA 7791-01: 1.5-inch milling and 2-inch HMA overlay on K-49 from US 81 to US 160. Pearson, $3,188,827.95.