KDOT Lettings: October, 2019

Federal Aid (unless otherwise noted):

75-7 KA 5493-01: Pavement marking and rumble strips on US 75 in Brown county.
75-43 KA 5492-01: Pavement marking from 3 miles south of Netawaka north to the Jackson/Brown county line
75-66 KA 5494-01: Pavement marking on US 75 in Nemaha county

56-57 KA 5263-01: Concrete pavement slab replacement along US 56/77 near Lost Springs

36-101 KA 3243-01: Grading and surfacing between K-22 and Washington. Includes a few new signs

22-101 KA 5328-01: Milling and HMA overlay on K-22

148-101 KA 5341-01: Milling and HMA overlay from the east junction with K-9 north to US 36.

383-20 KA 5345-01: Milling and HMA overlay from Jennings east to the Decatur/Norton county line.
383-20 M 0073-01: Stockpile asphalt material (non-FA)

283-69 KA 5344-01: Milling and HMA overlay from the Graham/Norton county line to the west junction with K-9.

23-90 KA 5342-01: Ultrathin bonded asphalt surfacing, milling and HMA overlay from the Gove/Sheridan county line north to Hoxie.

169-2 KA 2380-01: Grading, bridge & surfacing on US 169 from Welda to Garnett. Includes new signing

166-10 KA 5346-01: Milling and HMA overlay on US 166 in Chautauqua county
166-63 KA 5348-01: Milling and HMA overlay from the Chautaqua/Montgomery County line to US 75

35-30 KA 3102-01: Replacement of the Montana Road bridge over I-35 southeast of Ottawa

56-5 KA 5409-01: Pavement marking from Great Bend to Ellinwood

254-8 KA 5353-01: Milling and HMA overlay from the Sedgwick/Butler county line to I-35

400-8 KA 5354-01: Milling and HMA overlay from US 54 east to Leon

15-18 KA 5349-01: Ultrathin bonded asphalt surfacing from US 166 north to US 160

15-18 KA 5350-01: Milling and HMA overlay from K-55 northwest to the Cowley/Sumner county line
15-96 KA 5351-01: Milling and HMA overlay from the Cowley/Sumner county line to the Sumner/Sedgwick county line.

160-39 KA 5352-01: Milling and HMA overlay from Harper east to the Harper/Sumner county line.

56-73 KA 5152-01: Grading and surfacing from the Pawnee River bridge to 1st Street in Larned.

19-73 KA 5425-01: Pavement marking from the K-19 spur to the Pawnee/Stafford county line.
19-93 KA 5426-01: Pavement marking from th the Pawnee/Stafford county line to US 281.

156-73 KA 5442-01: Pavement marking from the Hodgeman/Pawnee county line to Larned.

14-78 KA 5427-01: Pavement marking from the old K-14 junction west of Nickerson to the Reno/Rice county line.
14-80 KA 5428-01: Pavement marking from the Reno/Rice county line north to Lyons (excluding Sterling).

235-87 KA 3895-01: Grading, bridge and surfacing near West Street. Reconstruction of the ramps, roadway, and a bridge northwest of West Street.
235-87 KA 5100-01: New Traffic signals at I-235 and west and on the eastbound I-235 ramps at Seneca. Diagrams show the left turn lanes as type-I five-signal vertical signal head. However, there are signs indicating that these will be FYA instead. (non-FA)

54-13 KA 5317-01: Milling and HMA overlay on US 54 in Clark county.
54-29 KA 5318-01: Milling and HMA overlay on US 54 in Ford county.
98-60 KA 5320-01: HMA overlay on K-98

56-29 KA 5489-01: Pavement marking on the Dodge City eastern bypass and near Wright.
50-35 KA 5491-01:: Pavement marking on the passing lanes from the Finney/Grey county line to Cimmarron

51-65 KA 5355-01: HMA overlay from the State line east to west junction with K-27
51-65 KA 5356-01: Milling and HMA overlay from the east junction with K-27 to the west junction with US 56 (non-FA)

51-88 KA 5357-01: Milling and HMA overlay from the Stevens/Seward county line east to US 83.
51-95 KA 5358-01: Milling and HMA overlay from the east junction with US 56 east to the Stevens/Seward county line.

25-102 KA 5321-01: Milling and HMA overlay from Leoti north to the Wichita/Logan county line.

105 N 0682-01: Safe Routes to school pedestrian & bicycle paths near Willard and White elementary schools in KCK.

62 C 4917-01: Replacement of this bridge on “A” road north of Glen Elder

1 C 4908-01: Replacement of this bridge

Non-FA:

56-64 KA 5487-01: Basedrain grading between Council Grove and the Morris/Lyon county line.

106 KA 5340-01: Surface recycle and chip seal on K-146 from the Republic/Washington county line east to K-9, K-9 from K-148 to the Washington/Marshall county line (this includes the K-9/K-148 concurrency), and K-119.

81-106 KA 5417-01: Milling and HMA overlay on various spots in Cloud and Republic counties.

24-90 KA 5343-01: Milling and HMA overlay from the Thomas/Sheridan county line to Hoxie

135-87 KA 5166-01: Sign structure replacement on northbound I-135 to 47th Street

106 KA 5434-01: Asphalt crack sealing in various locations in KDOT district 5.

KDOT Lettings: September, 2019

Federal-Aid (unless otherwise specified):

56-46 KA 2745-02: New Turn lanes at the intersection of US 56 and 199th Street/Sunflower Road on the east side of Edgerton

81 U 2335-01: Sidewalk improvements – Safe Routes to School project in Manhattan.

70-105 KA 4946-01: Bridge repair near Turner Diagonal

70-21 KA 5410-01: Pavement marking on I-70 in Dickinson County.
70-85 KA 5408-01: Pavement marking on I-70 from Niles Road east to the Saline/Dickinson County Line

18-72 KA 5299-01: Milling and HMA overlay from the south junction with old US 81 to the Ottawa/Dickinson County Line.

25-55 KA 5305-01: Milling and HMA overlay from the east junction with US 40 to the Logan/Thomas County Line
25-97 KA 5306-01: Milling and HMA overlay from the Logan/Thomas County Line north to I-70 at Colby

9-74 KA 5307-01: Milling and HMA overlay from the Norton/Phillips County Line east to US 183
9-74 M 0072-01: Stockpile asphalt material [Non-FA]

91 KA 5406-01: Pavement marking from the South City Limits of Goodland north to the North Junction of K-25 with US 24B

70-91 KA 5407-01: Pavement marking from the State Line east to County Road 14

9-92 KA 3100-01: Bridge replacment on K-9 over Cedar Creek east of Cedar

40-100 KA 5303-01: Milling and HMA overlay on US 40 from K-27 east to to the Wallace/Logan County Line
40-100 M 0071-01: Stockpile asphalt material [Non-FA]

59-2 KA 4812-02: Guardrail improvements on US 59 from Garnett to the Anderson/Franklin County Line

69-19 KA 1554-03: Upgrading US 69 from 2 lanes to 4-lanes divided around Arma. The plans have a goof as of 8/26. A BGS for the US 69 intersection is designed with “US A” instead of “US 69 Buisness”

281-5 KA 5314-01: Surface recycle, UBAS and chip seal from the Pawnee/Barton County Line north to Great Bend
281-93 KA 5312-01: Surface recycle, UBAS and chip seal from K-19 north to the Pawnee/Barton County Line.

8 N 0655-01: Bridge Replacement of the 159th Street Bridge over the Kansas Turnpike in Andover.

61-78 KA 5405-01: Pavement marking on K-61 from Hutchinson north to the Reno/McPherson County Line.

135-87 KA 5043-01: Bridge repair on Northbound I-135 over Southeast Boulevard in Wichita.

96-36 KA 5316-01: Milling and HMA overlay from the State Line east to Tribune

27-38 KA 5319-01: Surface recycle and UBAS from the Stanton/Hamilton County Line north to Syracuse
27-94 KA 5315-01: Surface recycle and UBAS from Johnson City north to the Stanton/Hamilton County Line.

75 C 4922-01: Bridge Replacement on Parallel Road over French Creek. [Parallel Road is on the Pottawatomie/Nemaha County line]

79 C 4923-01: Bridge Replacement in northwest Republic County

19 C 4911-01: Bridge Replacement on 580th Avenue over Hickory Creek

48 C 4915-01: Bridge Replacement on 80th Avenue over the South Fork Ninnescah River southeast of Kingman

87 TE 0434-01: Pedestrian & bicycle paths along Rock Road between Derby and Mulvane

Non-FA:

75-7 KA 5285-01: Rumble strip grinding between US 36 and K-246

15 KA 5302-01: Milling and HMA overlay on US 24 between the Mitchell/Cloud County Line and US 81, and on K-194

14-27 KA 5295-01: Milling and HMA overlay between Ellsworth and I-70

53 KA 5298-01: Surface recycle and chip seal between Lincoln and the Lincoln/Ottawa County Line

9-74 KA 5308-01: Milling and HMA overlay between US 183 and Kirwin

183-17 KA 5310-01: Milling and HMA overlay between US 160 and the Commanche/Kiowa County Line
183-49 KA 5309-01: Milling and HMA overlay between the Commanche/Kiowa County Line and US 54/400 at Greensburg

14-48 KA 5311-01: Milling and HMA overlay between K-42 and Kingman

28 KA 5293-01: Milling and HMA overlay on US 83 from the junction with old 83 south of Garden City north to US 50, and US 83B from the South Junction with US 83 north to the City Limits.
(NOTE: Old 83 is NOT the same as US 83B)

August, 2019 KDOT lettings

Federal-Aid

192-44 KA 5324-01: Removing and replacing pavement markings on K-192 in Jefferson County.
192-52 KA 5325-01: Removing and replacing pavement markings on K-192 in Leavenworth County.

52 C 4896-01: Major collect signage upgrad on Leavenworth County Road 5 from Tonganoxie to Leavenworth and on County Road 10 from Dempsey Road to County Road 5.

92-52 KA 5323-01: Removing and replacing pavement markings on K-92 from the Jefferson/Leavenworth County Line to 15th Street in Leavenworth.

66 TE 0462-01: New Sidewalk along 6th Street in Sabetha from Main Street to the Sabetha sports complex

106 KA 5218-01: Bridge repair for the Centennial Bridge (K-92) in Leavenworth and the I-435 Missouri River Bridges in KCK

177-9 KA 3943-01: Bridge replacement on the bridge over US 50. Detour via Cottonwood Street in Strong City and US 50.

177-9 KA 4430-01: Bridge replacement over Fox Creek 3 miles north of Strong City. Traffic to be carried via shoo-fly detour.

177-9 KA 4431-01: Bridge replacement over Fox Creek 5 miles north of Strong City. Traffic to be carried via shoo-fly detour.

24-71 KA 5294-01: Surface recycle and chip seal from Alton east to the south junction with US 281.

281-84 KA 5290-01: Chip seal from the west junction with K-18 to the east junction with K-18.

56-5 KA 5289-01: Mill and HMA overlay from Pawnee Rock to Great Bend.

56-80 KA 5287-01: Mill and HMA overlay from Lyons to the Rice/McPherson County Line

183-83 KA 5288-01: Mill and HMA overlay from the Pawnee/Rush County Line north to LaCrosse

Non-FA

106 KA 5379-01: RAP Sample Milling in KDOT Dsitrict 1

106 KA 5378-01: RAP Sample Milling in KDOT Dsitrict 2

106 KA 5380-01: RAP Sample Milling in KDOT Dsitrict 4

14-80 KA 5286-01: Mill and HMA overlay from Lyons north to the Rice/Ellsworth County Line

4-83 KA 5327-01: Asphalt crack sealing on K-4 in Rush County

106 KA 5326-01: RAP Sample Milling in KDOT Dsitrict 6