Categories
highways

KDOT Lettings, February 2023

There are only 11 projects up for bids on February 15. Approved Bids announced on February 27 are highlighted in red.

Federal-Aid:

9-66 KA 3885-01: Replace Bridge #016 over Spring Creek Drainage west of Wetmore. Detour via K-62, K-16, and US 75. Ebert Construction Co Inc & Subsidiary, Wamego, $1,158,262.25.

77-81 KA 3922-01: Replace bridge #039 over Mill Creek 1.57 miles north of the North Junction with US 24 (no plans posted) King Construction Company Inc. & Subsidiaries, Hesston, $2,239,342.05.

156-27 KA 3939-01: Replacement of the K-156 Bridge #026 over Oak Creek located 1.13 miles northeast of K-140. Detour via K-140 and K-111. King, $1,998,650.60.

11 U 2401-01: Sidewalk upgrade on Country Road from High School Avenue to Kansas Avenue and Maple Street from Tennessee Avenue to East Avenue in Columbus

50-24 KA 5779-01: Rehabilitation of a passing lane area on US 50-56 between Kinsley and Offerle
50-29 KA 3234-02: Rehabilitation of a passing lane area on US 50-56 near 119th Road in Ford County.
50-29 KA 5780-01: Rehabilitation of a passing lane area on US 50-56 east of Spearville.
Venture Corporation, Great Bend, $19,374,340.49.

Federal-Aid, Local Projects:

22 C 4999-01: Replace the 195th Road/Old US 36 bridge over Peters Creek east of Troy. Re-let from November 2022. B & B Bridge Company LLC, St. Paul, Kansas, $819,993.00.

56 C 5145-01: Replace the J Road bridge over Troublesome Creek north of Emporia.

Non-FA:

54-104 KA 6458-01: Upgrade a guard fence on a Culvert just west of Yates Center. Rubick Construction Inc., Williamsburg, $186,684.96.

56-73 KA 6454-01: Guardrail upgrades northeast of Garfield. J & J Contractors Inc., Iola, $393,457.27.

Categories
highways

KDOT Lettings: March 2023

There are 17 projects up for bidding on March 22

Federal Aid (Unless noted):

10-46 KA 6651-02: Repair and overlay on the eastbound K-10 bridge over Kill Creek in Desoto. A new sign is part of the project – which maintains an existing redundancy “Kill Creek Creek.”

16-52 KA-5520-01: Reconstruction of the intersection of K-16 and Parallel Road (former K-90). Detour via US 59 and US 24.

470-89 KA 6733-01: Repair the I-470 bridges over 29th, Fairlawn, Gage, 37th, and Shunganunga Creek
75-89 KA 6739-01 Repair of the bridge carrying the ramp from westbound I-470 to eastbound I-70 [which is considered part of the US 75 main line] over SW 10th Street (non-FA)

50-106 KA 5787-01: Refurbishment of a Passing lane area between Walton and Peabody in Harvey and Marion Counties.

9-69 KA 3935-01: Replacement of the K-9 bridge (#052) over Scull Creek 3.97 miles east of the K-173 junction.
9-74 KA 3934-01: Replacement of the K-9 bridge (#033) over Crooked Creek, located 3.63 miles east of the Norton County Line.
9-74 KA 3962-01: Replacement of the K-9 Bridge (#034) over Wolf Creek, located 7.58 miles east of the Norton County Line.
The three bridge projects are tied together. K-9 is to be closed at the Scull Creek and Crooked Creek projects, with traffic detoured using US 283, US 36, and US 183. Traffic on the Wolf Creek project is to be carried through on a shoo-fly detour.

50-40 KA 5786-01: Construction of the westerly extension of the existing passing lane section of US-50 from 6.8 miles east of the I-135/US-50 junction east for 0.63 miles.

56-41 KA 5997-01: Reconstruction of La Lande Avenue from Pike Street to Inman Street in Sublette

Federal-Aid, Local Projects:

52 C-5144-01: Replace the Fairmount Road bridge over Little Stranger Creek.

89 C 5147-01: Replace the NW 66th Street over Indian Creek in Northern Shawnee County

37 C 5073-01: Replace the bridge on M Road over Tadpole Creek.

Non-FA:

70-84 KA 6858-01: Lighting upgrade on the I-70 rest area east of Russell

14-78 KA 1007-04/14-80 KA 1007-05: Milling, HMA Overlay, and bridge repair on the existing K-14/K-96 alignment between Hutchinson and Sterling in preparation for turnback when the new “Northwest Passage” alignment opens.

54-87 KA 6894-01: Repair of the 383rd Street bridge over US 54/400 in western Sedgwick County.

Categories
highways

KDOT Lettings: December 2022

There are 29 projects up for bids on December 14, including three bridge replacements, the removal of an unused bridge, and a new roundabout near Dodge City. Approved bids announced on January 9 are highlighted in red.

Categories
highways

KDOT Lettings: September 2022

There are 43 projects up for letting in September. Approved bids awarded on October 6 are highlighted in red. Approved bids announced on November 9 are highlighted in blue.

Categories
highways

KDOT Lettings: March 2022

34 projects were up for bids on March 16. Approved bids announced on March 31 are highlighted in red. Approved bids announced on May 2 are highlighted in blue

Categories
highways

KDOT Lettings: February 2022

25 projects are up for bids at KDOT on February 16. The approved bids announced on March 2 are highlighted in red.The approved bids announced on March 31 are highlighted in blue.

Categories
highways

KDOT Lettings: January 2022

There are 41 projects up for letting at KDOT’s January 19 letting, including many asphalt overlays of concrete roadways. Approved bids announced on January 27 are highlighted in red. Approved bids announced on March 2 are highlighted in blue.

Categories
highways

KDOT Lettings: December 2021

43 projects are up for bids at KDOT on December 15, including two major projects on US 50 around Dodge City and into the territory out west. Awarded bids announced on December 28 are highlighted in red. Awarded bids announced on January 27 are highlighted in blue.

Categories
highways

KDOT Lettings, November 2021

There are a total of 42 projects up for bidding in the November KDOT lettings. Approved bids announced on December 14 are highlighted in red.

Categories
highways

KDOT Lettings: October 2021

Here are the projects up for letting on October 20. Approved Bids announced on November 3 are highlighted in red. Approved Bids announced on December 14 are highlighted in blue.