KDOT Lettings: December 2025

The December lettings include a big-ticket item in the Wichita area. Awarded bids announced on January 6 are highlighted in red.

Federal-Aid:

73-7 KA 7811-01: 1.5-inch milling and 1.5-inch HMA overlay on US 73-159 from Horton to the Kansas-Nebraska State Line.  APAC-Kansas Inc. Shears Division, Hutchinson, $4,760,447.83.

435-46 KA 7592-01: Rehabilitate the I-435 bridges over Little Mill Creek in Shawnee. Comanche Construction Inc., Olathe, Kansas, $3,299,901.73.

35-56 KA 7873-01: Concrete pavement patching on I-35 in Emporia. RA Knapp Construction Inc., Lenexa, $524,080.00.

75-70 KA 7813-01: 1.75-inch milling and 1.75-inch HMA overlay on US 75 from the K-31/K-268 roundabout north of Lyndon to the start of the freeway south of Carbondale. APAC-Kansas, $3,299,285.98.

68-70 KA 7814-01: 1.5-inch milling and 1.5-inch HMA overlay on K-68 from US 75 south of Lyndon to K-268 north of Quenemo. APAC-Kansas, $1,547,180.80.

177-9 KA 5712-01: Replace the K-177 bridge over Rock Creek south of Bazaar. King Construction Company Inc & Subsidiaries, Hesston, $3,660,265.74.

177-9 KA 7818-01: 1-inch milling and 2-inch HMA overlay on K-177 from the Butler/Chase County Line to US 50 at Strong City. APAC-Kansas, $4,070,620.82

9-14 KA 7589-01: Rehabilitate the bridge over Parsons Creek east of Clifton. Traffic is to be carried on one lane controlled by signals. Wildcat Construction Co Inc & Subsidiaries, Wichita, $1,282,433.17

70-21 KA 7867-01: 4-inch milling and 4-inch HMA overlay on I-70 from MP 275 near Abilene to MP 283 west of Chapman. APAC-Kansas, $11,065,074.33.

156-27 KA 7819-01: 1.5-inch milling and 1.5-inch HMA overlay on K-156 from the Barton/Ellsworth County Line to Hollyrood, 3-inch milling and 2 1.5-inch HMA overlays (3 inches total) in Hollyrood, and a 1.5-inch HMA overlay from Hollyrood to K-140 at Ellsworth. Venture Corp., Great Bend, $5,577,048.74.

77-57 KA 7860-01: 5-inch milling and 5-inch HMA inlay on US 77 from the Butler-Marion County Line to US 50 at Florence. APAC-Kansas, $3,427,493.71.

135-85 KA 7343-01: Lighting replacement at exits 86, 88, 89, 90, and 92 in and near Salina. Atlas Electric, LLC, Wichita, $1,545,937.65.

25-97 KA 6021-01: Reconstruct K-25 between County Road ‘I’ and I-70 south of Colby. Venture, $13,356,460.88.

63 C 5354-01: Replace the 2500 Road bridge over Onion Creek in Montgomery County. Mission Construction Co. Inc., St. Paul, Kansas, $518,412.00.

63 TE 0521-01: Construct a new Multi-Use path along Main Street in Independence from Peter Pan Road to 27th Street, as well as connecting sidewalks on Laurel Street and Peter Pan Road.

59-67 KA 7785-01: 1.5-inch milling and 1.5-inch HMA overlay on US 59 from the Labette/Neosho County line to Stark. APAC-Kansas, $3,681,762.18.

47-103 KA 7841-01: 2.5-inch milling and 2-inch HMA overlay from Fredonia to Altonna. APAC-Kansas, $1,889,659.08.

75B-103 KA 7840-01: 1.5-inch milling and 1.5-inch HMA overlay on the entire length of US 75B in Altonna. APAC-Kansas, $281,168.10.

169-2 KA 7774-01: 2-inch milling and 2-inch HMA overlay on US 169 from the North junction with US 59 at Garnett to the Anderson-Franklin County line. Bettis Asphalt & Construction Inc., Topeka, $3,193,005.10.

156-5 KA 7603-01: Bridge repair over Walnut Creek Drainage northeast of Great Bend. L & M Contractors Inc., Great Bend, $505,096.40.

54-106 KA 6535-04: Construct the Kellogg Freeway from K-96 to 159th Street, transitioning back to an expressway at Andover Road. Dondlinger Wildcat EKC1 LLC, Wichita, Kansas, $287,967,204.14.

160-13 KA 7740-01: 2.5-inch milling and 2-inch HMA overlay on US 160 from the North Junction with US 283 east to the Clark/Commanche County Line. Venture, $5,785,390.26.

283-13 KA 7780-01/283-29 KA 7742-01: 1/2-inch milling and 1.5-inch HMA overlay on US 283 from US 54 at Minneola to US 56 on the south side of Dodge City in Clark and Ford Counties (Clark County segment is non-FA) APAC-Kansas, $3,450,083.05

54-29 KA 7747-01: 2-inch Milling and 2-inch HMA overlay on US 54 in Ford County. Ultrathin bonded asphalt surface outside of the city of Bucklin. APAC-Kansas, $2,368,283.49.

400-29 KA 7775-01: 2-inch milling and 2-inch HMA overlay on US 400 from Ford to the Ford/Kiowa County Line. APAC-Kansas, $2,462,999.71.

Non-FA:

69-46 KA 5700-07: Landscaping along 167th Street, US 69, and Blue Valley Parkway associated with the new Express Toll lanes Re-let Feburary 2026

10-46 KA 7276-01: Lighting upgrade on K-10 at Kill Creek Road, K-10 at Cedar Creek Parkway, and K-7 at 119th.  Wildcat, $966,467.95.

70-89 KA 7874-01: Portland Cement patching and bridge approach replacement along I-70 from Valencia Road to I-470. Iowa Civil Contracting Inc., Victor, Iowa, $1,348,700.00.

106 KA 7255-01: Signage replacement on K-7 and K-10 in Johnson County. Collins and Hermann Inc., St. Louis, Missouri, $4,000,000.00

77-31 KA 7732-01: Concrete pavement patching on US 77 from the South City Limits of Junction City to I-70. Iowa Civil Contracting, $790,761.89.

14-45 KA 7909-01: Crack Sealing on K-14 from US 36 to the Nebraska State Line. Pavement Pros LLC, McPherson, $102,629.47.

70-106 KA 7868-01: 2-inch milling and 2-inch HMA overlay on the ramps at Exits 206, 209, 216, and 233, as well as the ramps and parking lot at the rest area just west of the K-156 interchange. APAC-Kansas, $857,075.44.

14-106 KA 7905-01: Crack Sealing on K-14 from the Lincoln/Mitchell County Line north to US 36 in Mitchell and Jewell Counties. Pavement Pros, $304,941.41.

81-106 KA 7915-01: Crack Sealing on US 81 between MP 206.3 in Cloud County to MP 223.6 in Republic County. Pavement Pros, $310,215.80.

99-25 KA 7870-01/99-37 KA 7871-01: Chip Sealing on K-99 from US 160 to US 400 in Elk and Greenwood Counties. Dustrol Inc., Towanda, Kansas, $2,724,135.86.

99-37 KA 7820-01: Chip Sealing on K-99 from US 54 north to the Greenwood/Lyon County Line APAC-Kansas, $851,634.85.

47-67 KA 7790-01: 1.5-inch HMA overlay on K-47 from US 59 to St. Paul APAC-Kansas, $893,589.47.

31-106 KA 7806-01: 1/2-inch milling and 1.5-inch HMA overlay on K-31 from I-35 to Waverly in Osage and Coffey Counties. Bettis, $578,906.30.

99-106 KA 7837-01: 2-inch milling and 2-inch HMA overlay on K-99 from US 166 to US 160 in Chautauqua and Elk Counties. APAC-Kansas, $3,820,179.05.

75-103 KA 7836-01: 2-inch milling and 2-inch HMA overlay on US 75 from US 400 to the east city limits of Neodesha. APAC-Kansas, $653,241.35.

69-61 KA 7733-01: 1-inch milling and 1.5-inch HMA overlay from the Linn/Miami County Line to 1.29 miles south of 359th Street. Bettis, $2,097,168.74.

50-29 KA 7777-01: 1-inch milling and 1.5-inch HMA overlay on US 50 from the old East City Limits of Dodge City to the west junction with US 56/US 283. APAC-Kansas, $926,501.94.

56-29 KA 7778-01: 1.5-inch milling and 2-inch HMA overlay on US 56/US 283 from the East City limits of Dodge City to the west junction with US 50. APAC-Kansas, $684,842.07.

34-29 KA 7779-01: 1-inch milling and 1.5-inch HMA overlay from US 54 at Bucklin to US 400. APAC-Kansas, $615,456.56.

23-60 KA 7846-01: Crack Sealing on K-23 from the Oklahoma State Line north to US 54/160 at Meade Pavement Pros, $136,823.50.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *