The October lettings include a major item: Replacing the I-70 Polk-Quincy viaduct in Downtown Topeka. Awarded Bids announced on October 30 are highlighted in red. Awarded Bids announced on December 10 are highlighted in blue.

Federal-Aid

73-7 KA-3890-01: Remove the ‘U’ Street bridge over US 73/K-7 in Atchison. U Street will dead-end at US 73 after the project is completed. During the project, there will be a full closure of US 73, through traffic will be detoured via K-192 and US 59. Julius Kaaz Construction Co. Inc., Leavenworth, $878,007.00.

73-3 KA-7473-01/73-7 KA-7474-01: 1-inch milling and 1.5-inch HMA overlay from Horton to Lancaster. Bettis Asphalt & Construction Inc., Topeka, $3,298,007.92.

36-7 KA-6450-01:  Reconstruct curbs, add a sidewalk, and a 1-inch mill/2-inch Overlay in Fairview. Ebert Construction Co Inc & Subsidiary, Wamego, $2,297,375.52.

75-89 KA-7515-01/75-43 KA-7516-01: 1-inch RCI and 3-inch HMA Overlay from NE 62nd Street in Shawnee County to 158th Road in Jackson County (The segment in Shawnee County is non-FA)
Bettis, $10,085,359.24.

59-44 KA-7513-01: 1-inch milling and 1.5-inch HMA overlay on US 59 from US 24 to Oskaloosa.
24-44 KA-7510-01/24-23 KA-7512-01: 1-inch milling and 1.5-inch HMA overlay on US 24 from Perry to the Douglas/Leavenworth County Line. (Non-FA)
Bettis, $5,729,447.20

92-44 KA-7514-01: 2-inch milling and 1.5-inch HMA overlay from K-4 to Oskaloosa. Bettis, $2,718,791.78.

52 N-0773-01: Construct new pedestrian trails on the Basehor Civic Campus. Kings Construction Co. Inc., Oskaloosa,
$1,379,597.35.

24-81 KA-5564-01/KA-5565-01: Construct Roundabouts at the US 24/K-113 junction (5564) and the US 24/K-13 junction (5565). US 24. US 24 will be closed between K-113 and K-13 during part of the projects. Traffic will be detoured via K-113 and K-18. Ebert Construction Co. Inc. & Subsidiary, Wamego, $8,538,358.31.

82-81: 1.5-inch milling and 1.5-inch HMA overlay on K-82 from US 77 to US 24. Shilling Construction Co. Inc., Manhattan, $1,417,916.43

81 TE-0525-01: Reconstruct Juliette Avenue from Pierre to Poyntz in Manhattan. Bayer Construction Co. Inc., Manhattan, $1,210,882.95.

70-89 KA-1266-04: Reconstruction of the Polk-Quincy viaduct in Downtown Topeka. Bettis-Koss Construction Joint Venture, Topeka, $239,178,617.48.

105 N-0779-01: Improvements to the Kansas River Levee Trail near Kansas Avenue. Gunter Construction Company, Kansas
City, Kansas, $673,235.50.

105 N-0781-01: pedestrian improvements along James Street. Multicon Inc., Park City, $317,151.52

77-57 KA-7490-01: 3/4-inch milling and 1.5-inch overlay on US 77 from US 50 to the south junction with US 56. Bettis, $1,598,626.62

50-57 KA-7491-01: full-depth patching and 1.5-inch HMA overlay on US 50 from US 77 to the Marion-Chase County Line. Bettis, $1,929,159.25

106-72 KA-7489-01: 1.5-inch surface recycle from Minneapolis East to the Ottawa County State Lake. Dustrol Inc., Towanda, $946,547.20.

72 C-5223-01: replace a concrete arch bridge on the west side of Minneapolis. Reece Construction Company, Inc., Salina,
$1,119,686.64.

26 C-5221-01: Replace a bridge on 370 Avenue southeast of Victoria. L & M Contractors Inc., Great Bend, $673,540.75.

71 C-5233-01: Replace a bridge on 180th Avenue southwest of Covert. Reece, $456,638.86.

281-92 KA-7481-01: 1-inch milling and 1.5-inch HMA overlay from the Smith/Osborne County Line to Smith Center. Bettis, $2,841,723.91.

70-97 KA-7445-01: 2-inch milling, 2-inch inlay, and 1.5-inch overlay from Exit 62 to the Logan/Thomas County Line. Venture Corporation, Great Bend, $9,009,553.76.

3-6 KA-5711-01: Replace the K-3 bridge over the Little Osage River

11 TE-0510-01: Safe Routes to School sidewalk improvements on Maple Street from Sunset Avenue to High School Avenue and Sycamore Street from 1st Avenue to 7th Avenue in Columbus. Heck & Wicker Inc., Parsons, $355,559.20

160-25 KA-6969-01: bridge repair on the US 160 bridge over the Elk River at Elk Falls. B & B Bridge Company LLC, St. Paul,
Kansas, $1,177,742.55.

18 TE-0471-01: Phase 2 of the Arkansas City hike and bike trail. , Prado Construction LLC, Valley Center, $1,345,884.20

2-39 KA-7396-01/2-48 KA-7397-91/2-96 KA-7398-01: 1.5-inch milling and 1.5-inch overlay from Harper northeast to K-42 in Harper, Kingman, and Sumner counties (Kingman and Sumner county segments are non-FA) Venture, $2,636,414.98.

42-96 KA-7394-01/42-48 KA-7395-01: 1.5-inch overlay on K-42 from K-14 to K-2. The segment in Kingman County, despite being the longer segment, is non-FA. Venture, $2,050,650.40

50-40 KA-7460-01:  1.75-inch milling and 2-inch overlay from Newton to the Harvey/Marion County Line. APAC-Kansas Inc.
Shears Division, Hutchinson, $2,705,193.91.

96-83 KA-7488-01: 1.5-inch milling and 1.5-inch overlay from the Ness/Rush County Line to US 183. Venture, $2,777,443.64.

49-96 KA-7378-01/49-87 KA-7379-01: 1.5-inch milling and 1.5-inch overlay from US 160 to K-42 in Sumner and Sedgwick counties. (Sedgwick County segment is non-FA) Venture, $2,216,957.09

81-96 KA-5768-01: Replace the US 81 bridge over Spring Creek. Detour via K-49 and US 160. Dondlinger & Sons Construction Co Inc., Wichita, $1,363,991.30.

56-95 KA-7497-01: 2-inch milling and 2-inch HMA overlay between K-51 and K-25 in Hugoton. Venture, $1,078,907.00.

25-34 KA-7499-01/25-95 KA-7497-01 1-inch milling and 1.5-inch HMA overlay from US 56 to Ulysses (Stevens County segment is non-FA) Venture, $5,075,708.50

83-41 KA-1008-02: reconstruction of US 83 from US 56 north to 150 Road. Venture, $15,545,585.53

83-41 KA-7500-01: 1-inch milling and 1.5-inch HMA overlay from the Seward/Haskell Counet line to US 56. Venture, $1,052,824.11

54-88 KA-7501-01: 1-inch milling and 1.5-inch HMA overlay from the end of the 4-lane segment to the Seward/Meade County Line. J & R Sand Company Inc., Liberal, $2,113,474.59.

Federal-aid, local projects

9 C-5219-01: Replace the 130th Road bridge over the Cottonwood River. The existing bridge is to remain in place. A M Cohron & Son Inc., Atlantic, Iowa, $1,748,517.51.

63 C-5226-01: Replace the 1800 Rd bridge over Pumpkin Creek east of Coffeyville. Bridges Inc., Newton, $1,774,971.60.

78 C-5229-01:  Replace the Victory Road bridge over the Little Arkansas River southeast of Buhler. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $738,711.49.

Non-FA:

159-44 KA-7475-01: 1.5-inch milling and 1.5-inch HMA overlay on US 159 in Nortonville. Bettis, $319,864.00.

40-89 KA-7504-01: 3/4-inch milling and 2-inch overlay from K-4 to Tecumseh Road. Bettis, $500,578.44

106 KA-6712-01: Installation of new DMS and cameras in the KC metro. Capital Electric Line Builders Inc., Parkville, Missouri,
$2,705,470.00

670-105 KA-6745-01/670-105 KA-6748-01:  repair work on the  I-670 viaduct/. 6745 covers eastbound 670. 6748 covers westbound 670.
70-105 KA 6768: repair work on the Central Avenue bridge over I-70
Clarkson Construction Company, Kansas City, Missouri, $9,277,684.57

106-72 KA-6725-01: repair on the K-106 bridge over the Solomon River on the west side of Minneapolis. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $735,403.60.

281-71 KA-7480-01: 2-inch milling and 2-inch overlay from State Street in Portia to the Smith/Osborne County Line. Bettis,$241,109.22.

24-71 KA-7476-01: Ultrathin Bonded Asphalt Surfacing from Osborne to the Osborne/Mitchell County Line. Bettis, $2,436,686.53

69-6 KA-6967-01: Repair of the US 69 bridge over Wall Street in Fort Scott. PCI Roads, LLC, Saint Michael, Minnesota, $1,552,793.79

75-16 KA-7486-01: Chip seal from the the north junction with K-58 to Burlington. Vance Brothers Inc. And Subsidiary, Kansas City, Missouri, $318,180.00.

169-30 KA-7482-01/169-61 KA-7483-01: 1.5-inch milling and 1.5-inch HMA overlay from the Anderson/Franklin County Line to the start of the freeway south of Osawatomie. Bettis, $1,538,826.53

166-63 KA-6466-01: Guardrail improvements along US 166 between Caney and Coffeyville Klaver Construction Company Inc., Wichita, $1,394,407.21

75-104 KA-7487-01: Chip Seal from the Wilson/Woodson County line to Yates Center. Circle C Paving And Construction
LLC, Goddard, $710,273.18.

183-73 KA-7380-01: ¾-inch milling and 1.5-inch HMA overlay on US 183 from US 56 to K-156. Venture, $2,269,583.80.

54-60 KA-7558-01: 1-inch milling and 1.5-inch HMA overlay from the Seward/ Meade County Line east .103 miles. J & R Sand Company, $42,251.40.