Awarded bids announced on October 7 are highlighted in red. Awarded bids announced on October 30 are highlighted in blue.
77-58 KA 3924-01: Replace the US 77 bridge over Deer Creek west of Oketo—traffic to be carried via a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $2,708,367.10.
99-58 KA 5764-01: Replace the K-99 bridge over Jim Creek South of Frankfort. Ebert Construction Co Inc. & Subsidiary, Wamego, Kansas, $2,508,724.76.
77-58 KA 6897-01: Reconstruct 10th Street (US 77) in Marysville from the north end of the Union Pacific Bridge to Oak Street.
99 C 5238-01: Replace the Fairfield Road Bridge over Hendricks Creen north of Alma. King, $673,463.75.
9 TE 0533-01: Reconstruct Cottonwood Street in Strong City from 4th to 7th. Killough Construction, Inc., Ottawa,
$872,916.56
31 C 5231-01: Replace a culvert on Old Milford Road. Bayer Construction Co. Inc., Manhattan, $536,461.18
45 C 5232-01: Replace the 100 Road bridge over Limestone Creek. L & M Contractors Inc., Great Bend, Kansas, $710,551.00
18-53 KA 5713-01: Replace a culvert on K-18 east of Beverly. Klaver Construction Company Inc., Wichita, $1,105,443.78.
40-100 KA 7313-01: Superelevated Corrections, a 2.5 inch mill and inlay, a 3-foot addition of 8” thick shoulders, and a 1.5” Overlay from the Colorado State Line to the east city limits of Sharon Springs
40-100 KA 7316-01: Superelevated Corrections, a .5 inch mill and 2.0” inlay, and 3-foot addition of 8” thick shoulders, and a 1.5” Overlay from Sharon Springs to Pebble Road in Wallace County
APAC-Kansas Inc. Shears Division, Hutchinson, $11,168,116.39
3-19 KA 7450-01/3-6 KA 7449-01: 1-inch milling and 1.5-inch HMA overlay from K-47 in Crawford County to K-39 in Bourbon County (Bourbon County segment is non-FA) APAC-Kansas, $1,642,155.29
7-19 KA 7451-01: 3-inch milling and 3-inch HMA overlay from US 400 to Girard. 3-inch milling and 4-inch overlay at K-126 junction. APAC-Kansas, $3,868,907.87.
50 C 5222-01: Replace the 25000 Road bridge over the Neosho River east of Parsons. B & B Bridge Company LLC, St. Paul, $525,146.05.
103 U 2404-02: Safe Routes to School sidewalk improvements in Neodesha. Heck & Wicker Inc., Parsons, $634,114.30.
56-5 KA 6363-01: Reconstruct sidewalk ramps and install new traffic signals at US 56 and McKinley Street in Great Bend. Phillips Southern Electric Company Inc., Wichita, $899,021.50.
54-8 TE 0508-01: Construct a new bridge for the Redbud Trail over US 54 near Ramona. Dondlinger & Sons Construction Co.
Inc., Wichita, $1,533,312.95
87 N 0727-01: Reconstruct a portion of Nelson Drive in Derby. Includes a roundabout at Venture Lane. Pearson Construction LLC, Wichita, $7,318,642.00
93 C 5237-01: Replace the NE 130th Avenue bridge over Rattlesnake Creek. The old bridge is a timber structure. L & M, $663,989.00.
81-96 KA 5772-01: Replace the US 81 bridge over Bluff Creek south of Caldwell. Full Closure during part of the project, detour via OK 11, OK 132/K-179, K-44, and K-49. King, $4,983,484.43.
156-28 KA 5759-01: Replace the K-156 bridge over the Pawnee River. Traffic is to be carried via a Shoo-Fly Detour. L & M, $2,434,928.38.
156-42 KA 5802-01: Shoulder Widening and pavement refresh of K-156 from 214 Road to 228 Road in Hodgeman County. Work is mainly to be done in segments no more than one mile with one-lane traffic controlled by signals or Pilot car. There is a segment that will require K-156 to be completely closed – Detour via K-23, US 50, and US 283. Venture Corporation, Great Bend, $21,508,140.12.
Federal-Aid, Local projects
99 C 5193-01: Pavement Marking on Mission Valley Road in Wabaunsee County from K-4 to Harveyville Road. Heartland Traffic Services Inc., Kansas City, Kansas, $360,113.00.
74 C 5227-01: Replace the Kiowa Road bridge over West Cedar Creek. L & M Contractors Inc., Great Bend, $547,817.15.
24 C 5199-01: Improvements to 260th Road from the Kiowa/Edwards County Line to S Road, and 270th Road from S Road to US 50. Venture, $871,453.80.
Non-FA:
106 KA 7238-01: Sidewalk improvments at K-92 and 19th Street in Leavenworth, and on K-9 in Whiting at 2nd and 3rd Streets. Multicon Inc., Park City, $201,228.58.
106 KA 7454-01: Improvements at multiple continuously operating reference station sites. Phillips Southern, $343,805.00.
16-106 KA 7469-01: Full-depth HMA patching, 1-inch cold milling, 1.5-inch HMA Overlay, adding a 2-foot wide and 8-inch HMA shoulder extension and placing a rock pavement edge wedge on K-16 from K-92 in McLouth to US 24 in Tonganoxie. J M Fahey Construction Company, Grandview, Missouri, $4,095,096.00.
69-105 KA 6964-01: Bridge repair on the 18th Street Expressway bridge over Merriam Lane and Turkey Creek. PCI Roads, LLC, Saint Michael, Minnesota, $773,608.50
82-14 KA 6721-01: Extend an existing Concrete culvert taking K-18 and Osage Road over Cane Creek. Reece Construction Company, Inc., Salina, $793,520.47
70-26 KA 6954-01: Bridge repair on the westbound I-70 bridge over old US 40 and the UP Sharon Springs Subdivision. Wildcat Construction Co Inc. & Subsidiaries, Wichita, $425,300.50.
106 KA 6862-01: Signage upgrade in Bourbon County on all highways except for US 69 and K-7 south of Fort Scott. Collins & Hermann Inc., Kansas City, Kansas, $2,100,000.00.
77-8 KA 7456-01: Ultrathin bonded asphalt surfacing on US 77 from I-35 to the Butler/Marion County Line. Pearson, $2,365,085.02.
15-18 KA 7432-01: Chip seal on K-15 from US 166 to US 160. Circle C Paving and Construction LLC, Goddard, $514,362.30.
81-87 KA 7458-01: PCCP patching on US 81 from Grand Street in Haysville to 59th Street South. Interstate Improvement Inc., Faribault, Minnesota, $939,539.50.
55-106 KA 7048-01: Surface recycle and chip seal along the entire length of K-55 (No plans) Dustrol Inc., Towanda, $1,446,680.83
27-65 KA 7467-01/27-94 KA 7466-01: Surface recycle and chip seal on K-27 from US 56 to US 160, excluding the K-27/K-51 concurrency. Dustrol, $5,105,633.47
Leave a Reply