KDOT Lettings: August 2026

Federal-Aid

70-31 KA 6837-01: Replace the Milford Lake Road bridge over I-70 west of Junction City.
70-31 KA 6838-01: Replace the Westbound I-70 bridge over Franks Creek and B Street in Grandview Plaza.

61-59 KA 6755-01: Replace the bridge deck on the Southbound K-61 bridge over US 81B and K&O Newton Subdivision on the south side of McPherson. Detour via I-135 or US 81B, US 56, and K-153.

98 TE 0535-01: Sidewalk improvements on Main Street in WaKeeney from Railroad Avenue to Warren Avenue, Russell Avenue from 4th Street to 6th Street, the North side of Railroad Avenue from Main Street west 1/2 block, and the south side of Warren Avenue from Main Street east 1/2 block.

11 KA 6441-01: Reconstruct Military Avenue (US 69A) from 23rd to 20th Streets in Baxter Springs.

50 TE 0551-01: New sidewalk construction in Altamont.

61 C 5353-01: Replace the 379th Street bridge over Middle Creek southwest of Louisburg.

40 TE 0576-01: Streetscape improvements and a mill and overlay in the 500 block of Commercial Street in the city of Sedgwick.

49 C 5352-01: Replace a bridge on F Road over the East Fork Rattlesnake Creek northeast of Greensburg.

61-76 KA 8036-01/61-78 KA 8037-01: 5.5-inch milling and 5.5-inch overlay (2 layers, 1.5-inches across the entire roadway, plus an extra 4 layers off the shoulders) on K-61 from Pratt to Arlington in Pratt and Reno Counties.

55-96 KA 6835-01: Replace two culverts on K-55 east of Belle Plaine.

28 C 5349-01: Replace the Ravena Road bridge over the Pawnee River in northeastern Finney County.

Federal-Aid, Local Project:

74 C 5316-01: Major collector signage replacement east of US 183 in Phillips County.

Non-FA:

27-12 KA 8024-01: Chip Seal on K-27 from US 36 to the Nebraska State Line.

36-69 KA 8025-01: Chip Seal on US 36 from the Decatur-Norton County Line to the west junction with K-383.

9-69 KA 8030-01: Chip Seal on K-9 the Decatur-Norton County Line from to US 283.

59-50 KA 8081-01: 2-inch milling and 2-inch overlay on US 59 from the North City Limits of Parsons to the Union Pacific overpass north of Parsons.

106 KA 8082-01: RAP sample milling at various locations in KDOT District 4.

400-106 KA 8084-01: Saw Cuts along US 400 from the Greenwood/Wilson County line to Fredonia, and again in Montgomery County.

17 KA 8031-01: Chip Seal on US 160 and K-1 in Comanche County.

77-018 KA 8026-01: Chip seal on US 77 from Winfield to K-15.

39 KA 7712-01: Chip seal on US 160 from the Barber/Harper County line to Harper and on K-2 from Anthony to US 160.

160-39 KA 8022-01: Microsealing on US 160 from Harper to the Harper/Sumner County Line

135-40 KA 8034-01: Concrete patching on I-135 between US 50 on the south side of Newton and K-15 on the North side of Newton.

135-87 KA 8035-01: Concrete patching on I-135 from 47th to Pawnee in Wichita.

96-106 KA 8027-01: Concrete patching on K-96 from the Reno/Sedgwick County Line to 119th Street.