KDOT Lettings: May 2025

Awarded bids announced on June 3 are highlighed in red.
Awarded bids announced on July 11 are highlighed in blue.

Federal-Aid:

3 U 2497-01: Replace the bridge on Julia Street over Brewery Creek in Atchison. Reece Construction Company, Inc., Salina, $721,997.24.

69-46 KA 7676-01: Pavement Marking on the Overland Parkway between 95th and I-35
435-46 KA 7677-01: Pavement Marking on I-435 from the Johnson County Gateway (K-10/I-35) to Metcalf.
Heartland Traffic Services Inc., Kansas City, Kansas,  $2,738,921.05.

177-81 KA 7660-01/177-31 KA 7659-01: 2-inch milling and 2-inch HMA overlay on K-177 from I-70 to just south of K-18 (Geary County segment, KA-7659-01, is non-FA)
Shilling Construction Co. Inc., Manhattan, $5,931,771.00.

177-9 KA 5677-01: Culvert repair over the Fox Creek Drainage at MP 53.6. Reece, $381,371.68.

70-26 KA 7608-01: Bridge repair on the Hall Street Bridge over I-70 at MP 158.24 in Hays
70-26 KA 7609-01: Bridge Repair on the Toulon Road Bridge over I-70 at MP 163.7 east of Hays
PCI Roads LLC, Saint Michael, Minnesota, $764,284.59.

54-87 KA 7675-01: Pavement Marking on Kellogg from Meridian to Washington Street. Roadsafe Traffic Systems Inc., Chicago, Illinois, $444,500.00.

83-28 KA 1008-04: Reconstruction of US 83 from TV Road to the Arkansas River bridge south of Garden City. “Super Two” with provisions for 4 lanes on an offset alignment. Sporer Land Development Inc., Oakley, Kansas, $44,561,333.09.

160-34 KA 5986-01: Reconstruction of Oklahoma Avenue in Ulysses from Comanche Street to Stubbs Street

Federal-Aid, Local Projects:

64 C 5280-01: Replace the K Avenue Bridge over the West Fork Neosho River southwest of Parkerville. Reece, $741,343.27.

33 C 5290-01: Replace the DD Road Bridge Over Bow Creek in northern Graham County.  L & M Contractors Inc., Great Bend, $1,096,471.00.

91 C 5294-01: Replace a bridge over a Tributary to the South Fork Sappa Creek Northeast of Edson. Klaver Construction Company Inc., Wichita, $431,424.86.

1 C 5293-01: Replace the Nebraska Road bridge over Elm Creek west of Moran. B & B Bridge Company LLC, St. Paul, Kansas, $538,932.75.

Non-FA:

99-56 KA 7680-01: 3/4-inch milling and 2-inch HMA overlay from the Greenwood/Lyon County line to Emporia. APAC-Kansas Inc. Shears Division, Hutchinson, $3,622,164.98.

4-99 KA 6763-01: Culvert replacement on K-4 at the South Branch Mission Creek Drainage. One lane of traffic is to be carried through the work zone, controlled by signals. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,176,125.56.

70-105 KA 7310-01: Bridge painting of the Will Street bridge over I-70 at MP 421.76. International Rigging Group LLC, Tarpon Springs, Florida, $336,542.00.

70-105 KA 7311-01: Bridge painting on the Eastbound I-70 bridges over the ramps from southbound I-435 ramps to eastbound I-70. International Rigging, $749,090.00.

106 KA 7257-01: Signage upgrade on US 81 from MP 158 to MP 174, K-18 from MP 108 to MP 140, and the entire length of K-106, mostly in Ottawa County. Cooper Construction LLC, Emporia, $1,101,178.90.

183-26 KA 7615-01: Bridge repair on US 183 over the Saline River at MP 169 in northern Ellis County. Reece, $339,095.46

106 KA 7280-01: Signage Replacement on US 36 in Decatur County, on US 83 from the US 83/K-383/K-23 junction to the Nebraska State Line, on K-123 from K-9 to K-223, on the entire length of K-223, and on K-383 from US 83/K-23 to the Decatur/Norton County Line. KOMO Construction LLC / DBA A&H Co., Elko New Market, Minnesota, $319,847.00.

69-19 KA 7230-01: Traffic Signal on US 69 at Centennial Drive in Pittsburg. C.D.L. Electric Co., Inc., Pittsburg, $420,328.00

106 KA 7667-01: Mudjacking at various locations in KDOT District 4. Nortex Concrete Lift & Stabilization Inc., Fort Worth, Texas, $99,641.00.

106 KA 7288-01: Signage upgrade on US 50 from US 281 to the Stafford/Reno County Line, on US 54 in Pratt County, on US 281 from the Barber/Pratt County line to US 50, on K-42 from US 281 to Nashville, and on K-61 from US 54 to K-11. Martin Outdoor Enterprises, Inc., Pittsburg, $1,196,445.25.

96-87 KA 7618-01: Repair the Tyler Road bridge over K-96 at MP 281.1 near the Maize/Wichita border. Wildcat Construction Co Inc & Subsidiaries, Wichita, Kansas, $272,073.20.


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *