KDOT Lettings: December 2020

There is a total of 30 projects in the December lettings, most of which are maintenance projects.

This post has been updated to reflect the approved bidders and the bid amount as announced by KDOT on January 7, 2021 and February 5, 2021. The approved bids announced on January 7 will be noted in red. The approved bid announced on February 5 will be noted in blue.

Federal-Aid:

(unless otherwise noted)

24-15 KA 3239-02: Culvert reconstruction/widening, mill/overlay, and signage replacement on US 24 from 2 miles west of Miltonvale to the Cloud/Clay county line. Ebert Construction Co Inc & Subsidiary, Wamego, Kansas, $7,026,598.82.

70-84 KA-5687-01: Repair of bridges 70-84-23.05 and 70-84-24.59 on Westbound I-70 near Dorrance. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, Kansas, $428,899.19.

106 KA 4746-02: Signage replacement on US 281 from the Barton/Russell County Line to 15th Street in Russell, US 281 from the West Junction with K-18 to the Russell/Osborne County line, K-18 from US 281 to the Russell/Lincoln County line, and K-232 from the Lincoln/Russel County line to K-18. KOMO Construction LLC / DBA A&H CO., Lakeville, Minnesota, $184,500.00

70-106 KA 4746-04: Signage replacement on I-70 in KDOT District 3 not previously covered by previous signage replacement projects. This does not include any exit guide sings (BGS). Martin Outdoor Enterprises Inc., Pittsburg, Kansas, $796,258.61.

31-02 KA 3907-01: Replacement of Bridge #030 (North Fork Little Osage Drainage) east of Kincaid. Traffic to be carried through the project via a shoo-fly detour. WCl, Inc., Paola, Kansas, $1,499,098.77

3-6 KA-5922-01: 1-inch surface recycle and micro surfacing from K-39 to US 54. Dustrol Inc., Towanda, Kansas, $868,507.73.

54-6 KA-5936-01: Surface recycling and ultrathin bonded asphalt surfacing from the Allen/Bourbon county line to US 69. APAC-Central, Inc., Fayetteville, Arkansas, $2,753,205.53.

103-11 KA-5940-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire route of K-103 APAC-Central, $718,523.75.

99-37 KA-5939-01: 1-inch milling and 1-inch HMA overlay from US 54 to the Greenwood/Lyon county line. Shilling Construction Co. Inc., Manhattan, Kansas, $1,513,389.00.

7-54 KA-5932-01: 1.5-inch milling and 1.5-inch HMA overlay from K-52 north to K-152. Shilling, $1,810,782.40.

166-63 KA-5942-01: 1-inch milling and 1-inch HMA overlay from the South Junction with US 75 near Caney to the west city limits of Coffeyville. Cornejo & Sons LLC, Wichita, Kansas, $1,719,972.65.

54-76 KA 5429-01: Reconstruction of a two-block section of 1st Street from New Street to Mound Street in Pratt from 9-inch concrete with earth base to 11-inch concrete with a gravel base. Two lanes of traffic to be maintained through the work zone. Vogts Parga Construction LLC, Newton, Kansas, $744,409.18

25-34 KA-5826-01: 1-inch milling and 2-inch HMA overlay from the north city limits of Ulysses to the Grant/Kearney county line. Venture Corporation, Great Bend, Kansas, $1,508,207.82.

27-36 KA-5930-01: 2.0-inch milling and ultrathin bonded asphalt surface on K-27 in Greeley County, with the exception of the section through Tribune. Venture, $4,394,345.52.

283-42 KA-5870-01: 1-inch milling and 2-inch HMA overlay from the Ford/Hodgeman county line to the south city limits of Jetmore
156-42 KA-5869-01: 1-inch milling and 1.5-inch HMA overlay from the east city limits of Jetmore to the Hodgeman/Pawnee county line (non-FA)
Venture, $4,539,465.64.

50-47 KA-5935-01: 1.5-inch milling and 1.5-inch HMA overlay from the east city limits of Lakin to the Kearny/Finney county line. Venture, $1,446,061.80.

56-65 KA-5833-01: 2-inch milling and 2-inch HMA overlay from the Oklahoma/Kansas state line to the west junction with K-51. APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $3,111,001.46.

Non-FA:

105 KA-5953-01: Full-depth patching, 1.5-inch milling, 1.5-inch HMA overlay, and Mastic surface treatment on the shoulders on K-7 from the Kansas River bridge to the concrete pavement north of Elizabeth Street in Bonner Springs. J M Fahey Construction Company, Grandview, Missouri, $1,884,737.81.

75-63 KA-5948-01: 2-inch milling and 2-inch HMA overlay on US 75 in Caney. Cornejo & Sons, $352,388.35.

63 KA-5950-01: Concrete pavement patching on the 4-lane segment of US 75/US 400 in northern Montgomery County. Emery Sapp & Sons Inc. And Subsidiaries, Columbia, Missouri, $1,159,593.20.

106 KA-5924-01: 1-inch milling and 1-inch HMA overlay on K-3 from K-31 south to K-65, the entire length of K-65 from K-3 to K-31, and K-31 from K-65 to the east junction with K-7. Shilling, $1,464,616.60.

54-106 KA-5944-01: 3-inch milling and 2-inch HMA overlay from the west junction with K-99 to US 75 in Greenwood and Woodson Counties. Shilling, $4,695,119.26.

56-106 KA-6041-01: Asphalt crack sealing on US 56 from Ellinwood to Lyons in Barton and Rice Counties. Mission Construction Co. Inc., St. Paul, Kansas, $99,810.78.

14-106 KA-6044-01: Asphalt crack sealing on K-14 from US 160 to K-42 in Harper and Kingman Counties. Scodeller Construction Inc., Wixom, Michigan, $94,929.92.

49-106 KA-6048-01: Crack Sealing on K-49 from 2 miles north of US 160 to K-42 in Sumner and Sedgwick Counties. Mission, $217,825.50.

53-96 KA-6047-01: Crack sealing along the entire length of K-53. Mission, $86,823.50.

56-106 KA-5843-01: 1-inch milling and 1.5-inch HMA overlay from K-190 near Satanta to Montezuma in Haskell and Gray Counties. Venture, $4,143,694.44.

144-106 KA-5847-01: 2-inch milling and chip sealing along the entire length of K-144 in Haskell and Grey counties. Dustrol, $1,338,066.98.

34-106 KA-5858-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire length of K-34 in Clark and Ford counties. Venture, $2,698,092.96.