KDOT Lettings, July 2023

There are 23 projects up for bids on July 19. Awarded bids announced on August 3 are highlighted in red. Awarded bids announced on September 6 are highlighted in blue

Federal-Aid:

46 N 0703-01: Sidewalk improvements on Center Street between Shawnee and McKinley Streets in Gardner. Primetime Contracting Corp., Riverside, Missouri, $199,634.00.

470-89 KA 5766-01: Replace the bridge over I-70 on the ramp from Westbound I-470 to westbound I-70 in West Topeka. Detour via Eastbound I-70 and turning around at Wanamaker. A M Cohron & Son Inc., Atlantic, Iowa, $7,691,334.98.

77 C 5134-01: Major collector signage upgrade in Rawlins County east of K-25. Signs Up LTD Haren’s Trees and Critters, Webster City, Iowa, $498,471.48.

169-63 KA 5989-01: Reconstruction of Walnut Street between Eldridge Street and 15th Street in Coffeyville. J Graham Construction Inc., Coffeyville, $1,241,166.00.

235-87 KA 6918-01: Pavement Marking on I-235 from I-135 on the South end to Broadway on the north end. (re-let from May 2023) Century Fence Co., Pewaukee, Wisconsin, $1,684,404.60.

25-102 KA 6444-01: Reconstruction of Fourth Street between Broadway and I Street in Leoti. Morgan Brothers Construction, Inc., La Crosse, $472,692.02.

Non-FA:

99-56 KA 6991-01: Scrub Seal and Chip Seal on K-99 from K-170 to US 56
170-106 KA 6988-01: Scrub Seal and Chip Seal on the entire length of K-170 in Lyon and Osage County
Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $1,523,196.08.

106 KA 7127-01: Rumble Strip grinding on US 81 from the Ottawa/Cloud county line to Eagle Road and on I-135 from the McPherson/Saline County Line to I-70. Surface Preparation Technologies LLC, New Kingstown, Pennsylvania, $105,255.00.

60-69 KA 7000-01: Chip seal along the entire length of K-60. APAC-Kansas Inc. Shears Division, Hutchinson, $187,992.33.

281-71 KA 7004-01: Chip Seal on US 281 from 270th Drive to the South City Limits of Osborne. Circle C Paving and Construction LLC, Goddard, $597,578.39.

91 KA 7058-01: Milling and overlay on a small loop road at the eastbound I-70 rest area west of Goodland. McCormick Excavation & Paving LLC, Stratton, Colorado, $393,526.00.

14-48 KA 6922-01: Crack Sealing on K-14 from K-42 to Kingman. Pavement Pro’s LLC, McPherson, $105,454.70.

15-40 KA 6997-01: Chip Seal on K-15 from North Newton to the Harvey/Marion County Line. Circle C, $358,066.63

50-78 KA 6790-01: Lighting upgrades at the US 50 interchange with Scott Boulevard. Phillips Southern Electric Company Inc., Wichita, $245,849.00.

4-80 KA 6916-01: Crack Sealing on K-4 in Rice County. Pavement Pro’s, $228,196.58.

54-87 KA 6179-01: Fiber installation along Kellogg in Wichita. Phillips Southern, $2,344,716.00.

54-87 KA 6770-01: Repair the westbound Kellogg bridge over the Big Ditch. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $1,178,719.00.

96-87 KA 7060-01: 1-inch RCI and 3-inch overlay on K-96 between Greenwich and Kellogg. Pearson Construction LLC, Wichita, $7,272,379.23.

81-96 KA 6921-01: Crack Sealing along US 81 in Northern Sumner County. Pavement Pro’s, $145,776.07.

96-36 KA 6994-01: Scrub seal and chip seal from K-27 to the Greeley/Wichita County Line. Heft and Sons LLC, Greensburg, $725,761.44.

156-42 KA 7003-01: Chip seal from the Finney/Hodgeman County Line to 214 Road. Heft and Sons, $689,668.00.

95-86 KA 6996-01: Scrub seal and chip seal along the entire length of K-95. Heft and Sons, $383,363.69.


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *