KDOT Lettings: June 2022

โ€”

in

There are 21 projects up for letting on June 15. The Awarded bids announced on July 6 are highlighted in red. The Awarded bids announced on August 4 are highlighted in blue.

Federal-Aid

23 TE 0497-01: Construction of a sidewalk along 10th Street from Church Street to Peach Street in Eudora Kansas Heavy Construction LLC, Shawnee, Kansas, $1,794,662.38.

92-44 KA 5413-01: Reconstruction of Union Street from Lake Street to Meridith Lane in McLouth.

24-75 KA 6202-01: 1.5-inch milling, 1.5-inch HMA overlay, and shoulder widening on US 24 from the Riley/Pottawatomie County Line to Shannon Road. Shilling Construction Co. Inc., Manhattan, $2,609,280.74.

70-81 KA 6403-01/70-99 KA 6405-01: Pavement patching from the Geary/Riley County Line to the K-30 interchange in Riley and Wabaunsee Counties. Emery Sapp & Sons Inc. And Subsidiaries, Columbia, Missouri, $2,470,618.00.

32-105 KA 3079-01: Replace the Turner Diagonal bridges over Kaw Drive, including new signage at the Turner Diagonal/Kaw Drive interchange. Unlike other junctions on the Turner Diagonal, the configuration of the junction will not be changed.
32-105 KA 6533-01: Concrete pavement patching and rehabilitation on the Turner Diagonal from Kaw Drive to 55th Street.
Miles Excavating, Inc., Basehor, $23,662,876.65.

73-105 KA 5241-01: Reconstruction of the US 73/K-7 intersection with Parallel Parkway. US 73 will have normal left turns onto Parallel, Parallel will have a “Michigan Left”, where all traffic must turn right and make a U-turn to turn left onto US 73 or continue on Parallel. Miles Excavating, $11,091,658.38.

27 C 5059-01: Major collector signage upgrade in Ellsworth County. Signs Up LTD DBA Haren’s Trees and Critters, Webster City, Iowa, $168,053.48.

156-27 KA 5415-01: Addition of turn lanes on K-156 at the K-140 junction. (re-let from November 2021) APAC-Kansas Inc. Shears Division, Hutchinson, $774,320.20.

383-69 KA 2371-02: Reconstruction of K-383 between the east junction with US 36 and Almena. Detour via US 36 and US 183. Venture Corporation, Great Bend, Kansas, $15,238,784.53.

42-48 KA 3879-01: Replacement of Bridge #044 on K-42 west of Spivey.

106 KA 6094-01: Signage upgrade on the non-interstate state routes in Harvey County. Martin Outdoor Enterprises Inc., Pittsburg, Kansas, $772,476.50

Federal-Aid, Local Projects:

23 C 5065-01: High friction surface treatment on Douglas County Route 442 near the Shawnee/Douglas County Line and on two curves on Douglas County Route 1055 between Vinland and Baldwin. The Truesdell Corporation, Tempe, Arizona, $525,525.00.

44 C 5057-01: Reconstruction of the intersection of Ferguson Road and Slough Creek Road. Bettis Asphalt & Construction Inc., Topeka, $522,922.90

89 TE 0503-01: Construction of the Deer Creek Trail between SE 25th Street and SE 29th Street in Topeka. Kings Construction Co. Inc., Oskaloosa, Kansas, $625,320.25.

92 C 5072-01: Replace the bridge on 220 Road over Cedar Creek in Smith County. L & M Contractors Inc., Great Bend, Kansas, $529,128.00.

Non-FA:

106 KA 6495-01: ADA Sidewalk ramp upgrades in Gridley and Madison. Burlington Construction, Inc., Burlington, Kansas, $93,616.00.

106 KA 6496-01: ADA Sidewalk ramp upgrades in Oswego, Chetopa, and Baxter Springs. Heck & Wicker Inc., Parsons, $137,303.00.

4 KA 6548-01: Mudjacking the bridge approaches on US 160 over Bear Creek and Bitter Creek, and on K-2 over the Medicine Lodge River.
87 KA 6546-01: Mudjacking at various bridge approaches in and around Wichita.
Raising Solutions LLC, Owensville, Missouri, $322,225.00.


Comments

One response to “KDOT Lettings: June 2022”

  1. […] 156-27 KA 5415-01: Addition of turn lanes on K-156 at the K-140 junction. Re-let June 2022 […]