KDOT Lettings – December 2023

Awarded bids announced on January 2 are highlighted in red.
One awarded bid announced on February 7 is highlighted in blue.

Federal-Aid

7-3 KA 7132-01/7-22 KA-7119-01: 1.5-inch milling and 1.5-inch HMA overlay from Atchison to the Nebraska state line. Bettis Asphalt & Construction Inc., Topeka, $5,652,729.16.

73-52 KA 5990-01: Storm Sewer replacement and reconstruction of 4th Street from Choctaw Street to Seneca Street in Leavenworth

35-56 KA 5714-01: Replace a culvert over Lincoln Street in Emporia with bridges. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $4,320,297.65.

70-89 KA 7198-01: 1.5-inch milling and 1.5-inch HMA overlay from Urish to MacVicar
70-89 KA 7239-01: 1.5-inch milling and 1.5-inch HMA overlay from 6th Street to the Toll Plaza

470-89 KA 7199-01: 1.5-inch milling and 1.5-inch HMA overlay from I-70 to 37th Street
470-89 KA 7240-01: 3.0-inch HMA overlay from Martin Avenue to the Toll Plaza.

635-105 KA 7191-01: Full-depth pavement patching 3.0-inch HMA overlay from the Argentine Yard to 43rd Street, including the ramps at K-32/Kansas Avenue and State Avenue

435-105 KA 7194-01: 1.5-inch milling and 1.5-inch HMA overlay from Leavenworth Road to the Missouri River Bridge. Ideker Incorporated, Saint Joseph, Missouri, $2,449,037.07.

81-15 KA 7130-01: Surface recycle and chip seal from 1 mile north of US 24 north 7 miles. Dustrol Inc., Towanda, $1,355,517.98.

18-84 KA 5737-01: Replace the bridge over the Wolf Creek drainage southeast of Lucas. Traffic to be carried on one lane controlled by temporary traffic signals. Klaver Construction Company Inc., Wichita, $1,654,435.83.

27-100 KA 7073-01: 1-inch milling and 1.5-inch HMA overlay from US 40 to the Wallace/Sherman County Line
27-100 KA 7074-01: 2-inch milling and 2-inch HMA overlay from 1 mile south of Sharon Springs to US 40 (Non-FA)
APAC-Kansas Inc. Shears Division, Hutchinson, $3,693,340.04.

400-11 KA 7135-01/400-50 KA 7136-01: 1.5-inch milling and 1.5-inch HMA overlay from York Road in Labette County to K-7 in Cherokee County (Labette County segment is non-FA) Bettis, $3,215,235.54.

126-19 KA 7122-01: 1/2-inch milling and 1.5-inch HMA overlay on K-126 from US 400 to K-7, and 1.5-inch milling and 1.5-inch HMA overlay from Pittsburg to the Missouri State Line. Bettis, $3,121,057.46.

54-37 KA 5718-01: Replace the US 54 bridge over Homer Creek west of Neal. Traffic to be carried on one lane controlled by temporary traffic signals. Bridges Inc., Newton, $3,786,610.05.

50 KA 7152-01/160-63 KA 7075-01: 1.5-inch milling and 1.5-inch HMA overlay on US 160 from US 169 to US 59 in Labette and Montgomery Counties, and a 1-inch milling and 1.5-inch HMA overlay along the entire length of K-101 (Labette County segment of US 160 is non-FA) Bettis, $4,243,334.73.

69-54 KA 7156-01: Ultrathin bonded asphalt surfacing from ~ 2.5 miles north of K-52 to the Linn/Miami County Line. Bettis, $1,871,550.28.

96-83 KA 7108-01: 2-inch milling and 2-inch HMA overlay from Rush Center to the Rush/Barton County Line
96-5 KA 7183-01: 1.5-inch milling and 1.5-inch HMA overlay from the Rush/Barton County Line to Great Bend
Venture Corporation, Great Bend, $8,023,568.50.

160-18 KA 7137-01/160-96 KA 7247-01: 1-inch milling and 1.5-inch HMA overlay from Oxford to Winfield. (Sumner County segment is non-FA) Pearson Construction LLC, Wichita, $1,735,006.82.

50-24 KA 7159-01: 1-inch milling and 1.5-inch HMA overlay from Kinsley to the Edwards/Stafford County Line. APAC-Kansas, $5,099,481.63.

14-78 KA 7128-01: Full-depth PCCP patching on K-14/K-96 around the west side of Hutchinson. Iowa Civil Contracting Inc., Victor, Iowa, $3,559,085.14.

50-93 KA 7037-01: 1-inch milling and 2-inch HMA overlay from the Edwards/Stafford County Line to US 281. APAC-Kansas, $4,850,016.86.

160-96 KA 7138-01: 1.5-inch milling and 1.5-inch HMA overlay from the Harper/Sumner County line to US 81. APAC-Kansas, $4,490,212.13.

160-13 KA 7095-01/160-60 KA 7096-01: 1/2-inch milling and 1.5-inch HMA overlay from US 54 to US 283 in Meade and Clark Counties. J & R Sand Company Inc., Liberal, $3,346,473.70.

83-28 KA 7133-01/83-86 KA 7134-01: Ultrathin bonded asphalt surfacing from Garden City to Scott City in Finney and Scott Counties. Venture, $5,550,079.80.

160-41 KA 7012-01/160-34 KA 7077-01: Ultrathin bonded asphalt surfacing from Ulysses to US 83 in Grant and Haskell Counties (Grant County is non-FA) Venture, $7,383,925.25.

96-102 KA 7054-01: 1.5-inch HMA overlay from Leoti to the Wichita/Scott County Line.
96-86 KA 7076-01: 2.5-inch milling and 2-inch HMA overlay from the Wichita/Scott County Line to Scott City.
167-102 KA 7052-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire length of K-167 (non-FA)
Venture, $9,384,464.50.

96-102 KA 7121-01: 1/2-inch milling and 1.5-inch HMA overlay from the Greeley/Wichita County Line to Leoti. Venture, $2,662,972.74.

Federal-Aid, Local projects

16 C 5122-01: Reconstruction of Old US 50 from Fauna Road to Lynx Road in Coffey County. Bettis, $3,175,168.49.

54 C 5081-01: Replace the N 2300 Road Bridge over the BNSF Fort Scott Subdivision northwest of La Cynge

61 C 5123-01: Reconstruct Old Kansas City Road from US 169 to Paola. Killough Construction Inc., Ottawa, $1,409,194.57.

Non-FA:

75-89 KA 7213-01: Repair of northbound and southbound bridges over the Kansas Turnpike and 42nd Street
75-89 KA 7214-01: Repair of the northbound and southbound bridges over Lower Silver Lake Road, the Union Pacific Kansas Subdivision, NW 25h Street, Soldier Creek, and NW 35th Street
4-89 KA 7115-01: PCCP patching on the Oakland Expressway between Shunganunga Creek and the Kansas River.
Bettis, $4,629,889.90.

70-106 KA 7195-01: 1.5-inch HMA overlay from K-30 to Valencia Road in Wabaunsee and Shawnee Counties. Bettis, $4,929,314.35.

15-57 KA 7082-01: 1-inch milling and 1.5-inch  overlay from US 56 to the Marion/Dickinson County Line. Shilling Construction Co. Inc., Manhattan, $3,733,007.70.

4-106 KA 7069-01: 1.5-inch HMA overlay from the Saline/Dickinson county line to Hope. Shilling, $3,306,212.55.

23-32 KA 6950-01: Bridge repair on the K-23 bridge over I-70. Reece Construction Company, Inc., Salina, Kansas, $211,891.89.

70-98 KA 6951-01: Repair bridges 016 and 028 on Eastbound I-70 near Ogallah. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $707,007.49.

99-10 KA 5411-03: Reconstruct a short section of K-99 just north of Sedan. Traffic to be carried on one lane controlled by temporary traffic signals. Bruce Davis Construction LLC, Emporia, $815,683.74.

33-106 KA 7112-01: 1.5-inch milling and 1.5-inch HMA overlay along the entire length of K-33. Bettis, $$1,871,550.28.

54-48 KA 6952-01: Bridge repair over the South Fork Ninnescah River west of Kingman. PBX Corporation, $76,436.09.


Posted

in

,

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *