Categories
highways

KDOT Lettings: November 2020

The November highway lettings mainly consist of maintenance projects, along with a couple of bridge replacements.

Federal-Aid:

59-3 KA-5885-01: 1.50 HMA overlay from the Jefferson/Atchison county line to the south city limits of Atchison.

36-7 KA-6005-01: Pavement marking on US 36 in Brown County. Through Fairview, US 36/1st Street to be re-striped from 4 lanes to 3.

36-22 KA-6004-01: Pavement marking from the Brown/Doniphan county line east approximately 3000 feet.

50-9 KA-5887-01: Milling and HMA overlay from the Marion/Chase county line east 9 miles, and from the Simmons Creek bridge east to K-177

14 C 4987-01: Pavement marking on major collector roads in Clay County

15-21 KA-5851-01: Milling and HMA overlay from the Marion/Dickinson county line to the south city limits of Abilene

24-62 KA 3950-01: Replace the Brown’s Creek bridge 7.61 miles east of K-128. Traffic to be carried through on a shoo-fly detour.

24-62 KA 3963-01: Replace the Mulberry Creek bridge, 11.15 miles east of K-128. Traffic to be carried through on a shoo-fly detour.

83-55 KA-5884-01: 2-inch HMA overlay from the Scott/Logan county line to US 40

54-1 KA 3913-01: Replace the bridge over the UP Parsons Subdivision on the east side of Moran and reconstructing the approaches. Detour via US 59, K-31, and K-3.

7-11 KA-6032-01: Pavement marking from US 69 to the Cherokee/Crawford county line

50-78 KA-5829-01: Milling and HMA overlay from the east end of the 4 lane freeway near Hutchinson to the Reno/Harvey county line.

28 C 4971-01: Major collector signing and pavement marking in Finney County

156-28 KA-5852-01: Milling and HMA overlay on K-156 from Garden City to K-23

50-28 KA-5886-01: Milling and HMA overlay from Garden City to the Finney/Ford County line

86 TE 0485-01: Rail-trail construction from Alice Avenue to 6th Street in Scott City

81-96 KA 4530-03: Grading, Flood Repair, and Riverbank Stabilization on the east bank of the Ninnescah River adjacent to US 81, located 1.4 miles north of the US 81/K-55 junction near Belle Plaine.

Non-FA:

24-52 KA-5883-01: Milling and HMA overlay from K-16 in Tonganoxie to the Leavenworth/Wyandotte county line.

32-106 KA-5868-01: 2-inch surface recycle from US 24-40 to Bonner Springs.

159-106 KA-5880-01: Milling and HMA overlay on US 159 from Effingham to Horton

244-31 KA-6030-01: Crack sealing along the entire length of K-244

9-106 KA 5861-01: 2-inch surface recycle and chip seal from Concordia to Clifton in Clay and Washington counties

15-106 KA-5865-01: Milling and HMA overlay from K-18 to Clay Center in Dickinson and Clay counties.

179-39 KA-6029-01: Crack sealing along the entire length of K-179.

160-94 KA-5840-01: Milling and HMA overlay from the Colorado state line to Johnson City.

Leave a Reply

Your email address will not be published. Required fields are marked *