The November highway lettings mainly consist of maintenance projects, along with a couple of bridge replacements.
This post has been updated to reflect the approved bidders and the bid amount as announced by KDOT in a release on December 10. The approved bids announced on November 5 will be noted in red.
Federal-Aid:
59-3 KA-5885-01: 1.50 HMA overlay from the Jefferson/Atchison county line to the south city limits of Atchison. Herzog Contracting Corp., St.
Joseph, Missouri, $1,795,474.96.
36-7 KA-6005-01: Pavement marking on US 36 in Brown County. Through Fairview, US 36/1st Street to be re-striped from 4 lanes to 3.
36-22 KA-6004-01: Pavement marking from the Brown/Doniphan county line east approximately 3000 feet.
Re-let in January 2021.
50-9 KA-5887-01: Milling and HMA overlay from the Marion/Chase county line east 9 miles, and from the Simmons Creek bridge east to K-177. APAC-Kansas Inc Shears Division, Hutchinson, Kansas, $2,747,855.04.
14 C 4987-01: Pavement marking on major collector roads in Clay County. Century Fence Co., Pewaukee, Wisconsin, $550,028.95.
15-21 KA-5851-01: Milling and HMA overlay from the Marion/Dickinson county line to the south city limits of Abilene. APAC-Kansas, $2,891,255.48.
24-62 KA 3950-01: Replace the Brown’s Creek bridge 7.61 miles east of K-128. Traffic to be carried through on a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $1,948,530.57.
24-62 KA 3963-01: Replace the Mulberry Creek bridge, 11.15 miles east of K-128. Traffic to be carried through on a shoo-fly detour. King, $2,090,417.57.
83-55 KA-5884-01: 2-inch HMA overlay from the Scott/Logan county line to US 40. APAC-Kansas, $5,434,727.00.
54-1 KA 3913-01: Replace the bridge over the UP Parsons Subdivision on the east side of Moran and reconstructing the approaches. Detour via US 59, K-31, and K-3. A M Cohron & Son Inc., Atlantic, Iowa, $3,703,814.47.
7-11 KA-6032-01: Pavement marking from US 69 to the Cherokee/Crawford county line Century Fence, $299,575.00.
50-78 KA-5829-01: Milling and HMA overlay from the east end of the 4 lane freeway near Hutchinson to the Reno/Harvey county line. APAC-Kansas, $2,940,894.45.
28 C 4971-01: Major collector signing and pavement marking in Finney County. Roadsafe Traffic Systems Inc., El Dorado, Kansas, $425,863.39.
156-28 KA-5852-01: Milling and HMA overlay on K-156 from Garden City to K-23. APAC-Kansas, $3,738,125.94.
50-28 KA-5886-01: Milling and HMA overlay from Towns Road near Garden City to the Finney/Ford County line. APAC-Kansas, $2,775,601.89.
86 TE 0485-01: Rail-trail construction from Alice Avenue to 6th Street in Scott City. RFB Construction Company, Inc., Pittsburg, Kansas, $297,796.02.
81-96 KA 4530-03: Grading, Flood Repair, and Riverbank Stabilization on the east bank of the Ninnescah River adjacent to US 81, located 1.4 miles north of the US 81/K-55 junction near Belle Plaine. Dondlinger & Sons Construction Co. Inc., Wichita, Kansas, $1,018,065.00.
Non-FA:
24-52 KA-5883-01: Milling and HMA overlay from K-16 in Tonganoxie to the Leavenworth/Wyandotte county line. Bettis Asphalt & Construction Inc., Topeka, Kansas, $3,648,825.09.
32-106 KA-5868-01: 2-inch surface recycle from US 24-40 to Bonner Springs. Bettis, $2,105,399.69.
159-106 KA-5880-01: Milling and HMA overlay on US 159 from Effingham to Horton. Herzog, $1,891,827.07
244-31 KA-6030-01: Crack sealing along the entire length of K-244 Pavement Pro’s LLC, McPherson, Kansas, $33,639.00.
9-106 KA 5861-01: 2-inch surface recycle and chip seal from Concordia to Clifton in Clay and Washington counties. Dustrol Inc., Towanda, Kansas, $1,627,361.80.
15-106 KA-5865-01: Milling and HMA overlay from K-18 to Clay Center in Dickinson and Clay counties. APAC-Kansas, $3,127,500.17.
179-39 KA-6029-01: Crack sealing along the entire length of K-179.Pavement Pro’s, $47,422.12.
160-94 KA-5840-01: Milling and HMA overlay from the Colorado state line to Johnson City. APAC-Kansas, $1,809,807.21.
Leave a Reply