KDOT Lettings: May 2022

There are 20 projects slated for letting on May 18. Approved bids announced on May 31 are highlighted in red. Approved bids announced on July 6 are highlighted in blue.

Federal-Aid:

10-46 KA 6085-01: Rehabilitation of three bridges on Westbound K-10 in DeSoto. Clarkson Construction Company, Kansas City, Missouri, $4,486,081.58.

105 KA 5495-02: Lighting upgrade in the vicinity of the I-70/I-670 junction in KCK. Capital Electric Line Builders Inc., Riverside, Missouri, $1,563,444.90.

635-105 KA 6087-01: Rehabilitation of the Shawnee Road bridge over I-635. Miles Excavating, Inc., Basehor, $2,711,569.21.

15-21 KA 6124-01: Repair the K-15 bridge over the Smoky Hill River south of Abilene. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $639,042.69.

135-59 KA 6063-01: Rehabilitation (possible full depth reconstruction) of I-135 from the Harvey/McPherson County line to the North junction with K-260. Koss Construction Co., Topeka, $19,189,012.05.

135-59 KA 6283-01: Lighting upgrade at the north junction of I-135 and K-260. Atlas Electric, LLC, Wichita, $197,207.00.

64-59 KA 6544-01: Pavement marking on K-61 from the Reno/McPherson County Line to US 81B. Cillessen and Sons Inc., Kechi, Kansas, $1,033,441.40

4-64 KA 5984-01: Reconstruction of MacKenzie Street from 5th Street to Grand Street in White City. Ebert Construction Co. Inc. & Subsidiary, Wamego, $999,107.14.

106 KA 6256-01: Signage upgrade in Thomas County on K-25, K-184, US 24 from I-70 to US 83, and US 83 from US 24 to the Thomas/Sheridan County Line. KOMO Construction LLC/DBA A&H Co., Elko New Market, Minnesota, $211,905.07.

106 KA 6257-01: Signage upgrade (mainly) in Graham County on US 24, US 283, K-18, K-84, and K-85. KOMO/A&H, $293,720.29.

106 KA 6111-01: Signage upgrade in Greenwood County on US 54, US 400, K-58, K-99, and K-249. KOMO/A&H, $637,033.96.

135-40 KA 6284-01: Lighting upgrade on I-135 at Lincoln Blvd in Hesston. Atlas Electric, $221,450.00.

55-96 KA 3887-01: Replace the K-55 bridge over the Arkansas River. Detour via US 81, K-53, and K-15. A M Cohron & Son Inc., Atlantic, Iowa, $8,227,018.62

96-102 KA 3274-01: Reconstruction of Broadway (K-96) in Leoti as a three-lane road with Angled parking on both sides.

Federal-Aid, Local Projects:

75 TE 0501-01: Pedestrian trail along Green Valley Road between Manhattan and St. George. Ebert, $999,015.91.

21 C 5079-01: Replace a bridge over Holland Creek just north of Carlton. Reece Construction Company, Inc., Salina, $802,484.49.

Non-FA:

435-46 KA 6400-01: Pavement patching on I-435 between Antioch and State Line. Clarkson, $5,119,813.10.

177-106 KA 5581-01: Fiber run along K-177 between I-70 and Manhattan. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $1,823,313.25

106 KA 6491-01: Pedestrian Ramp improvements in Grainfield and Dighton. Multicon Inc., Wichita, $140,272.20.

106 KA 6494-01: Pedestrian Ramp improvements in Centralia, Fairview, Winchester, Pomona, and La Cygne. Multicon, $75,513.50.


Posted

in

by

Comments

One response to “KDOT Lettings: May 2022”

  1. […] 105 KA 5495-02: Lighting upgrade along I-670 and I-70 from the I-70/I-670 junction to the Missouri State Line Re-let in May 2022 […]

Leave a Reply to KDOT Lettings: March 2022 – Richie Kennedy | route56.com Cancel reply

Your email address will not be published. Required fields are marked *