KDOT Lettings: October 2022

There are 26 projects up for bids on October 19. Approved bids announced on November 9 are highlighted in red. Approved bids announced on November 30 are highlighted in blue. One approved bid announced on January 9 is highlighted in purple.

Federal-Aid (Unless noted):

23 TE 0472-02: Maple Leaf Trail Phase 1: Pedestrian path along the east side of the Midland Railway storage track from High Street to Elm Street in Baldwin City. Bettis Asphalt & Construction Inc., Topeka, $699,036.25.

46 N 0703-01: Pedestrian and bicycle paths on Center Street bridge over BNSF and on the west side of Center Street from Shawnee Street to McKinley Street in Gardner. (no plans)

70 TE 0481-01: Construction of the Flint Hills Nature Trail in Osage City. Because the former Missouri Pacific right of way used by the trail crosses the BNSF Topeka Sub away from roads, the path of the trail will follow 5th Street south to Holliday Street, then east along Holliday to 8th, North on 8th to Lakin, East on Lakin to 9th, then North on 9th back to the MoPac ROW. (no plans) Bettis, $1,847,358.60

106 N 0716-01: MARC – operation green light ITS upgrades along 135th Street. Although the county code would indicate a multi-county project, this project is entirely in Johnson County. Custom Lighting Services LLC DBA Black and McDonald, Kansas City, Missouri, $764,026.00

9 U 2403-01: Safe routes to school sidewalk improvements in Strong City. Prado Construction LLC, Valley Center, $790,626.08.

59-2 KA 5422-01: Curb replacement and resurfacing on Maple Street from 4th Street to Redbud Ave in Garnett. Bettis, $1,554,874.55.

35-16 KA 6125-01: Repair the I-35 bridges over the BNSF Emporia Sub northeast of Lebo. PCI Roads, LLC, Saint Michael, Minnesota, $1,847,358.60

106 KA 6259-01: Signage replacement on the state highways in Wilson County. There are a total 2,037 signs in this project. Martin Outdoor Enterprises Inc., Pittsburg, $722,813.30

54-8 KA 6640-01: Ultrathin bonded asphalt surfacing on US 54-400 in Andover. Pearson Construction LLC, Wichita, $3,355,053.70

8 N 0692-01: reconstruction of 159th Street from Kellogg to Central Avenue. Pearson, $5,511,222.11.

15-87 KA 6710-01: Pavement Patching on K-15 from the Kansas Turnpike bridges in Wichita to the Derby City Limits (non-FA)
15-87 KA 6846-01: Pavement marking on K-15 from Clifton Avenue to the Derby City Limits. The plans specify that this is to be done after the associated pavement patching project above is completed.
Prado, $2,993,440.20

23-35 KA 6634-01/23-28 KA 6635-01: 1/2-inch milling and 1.5-inch HMA overlay from Cimarron to the K-156 in Gray and Finney Counties (Finney County segment is non-FA.) Venture Corporation, Great Bend, $3,442,046.60.

65 C 5124-01: Installation of Stop Ahead and Stop signs with solar-powered flashing LEDs and rumble strip grinding on D Road at 16th and 24th Road in Morton County. Cooper Construction LLC, Emporia, $61,154.00.

83-88 KA 3253-01: Grading, bridge and surfacing on US-83 from 0.256 MI south of RS 933 north to US-160 in Seward County (no plans) J & R Sand Company, Inc., Liberal, $18,979,543.32

Federal-Aid: Local Projects:

99 C 5112-01: Replace This bridge over Mill Creek east of Maple Hill. A M Cohron & Son Inc., Atlantic, Iowa, $1,807,094.15.

57 C 5069-01: Regrade, re-surface, and install rumble strips on Nighthawk Road at the intersection with K-256. Bruce Davis Construction LLC, Emporia, $333,977.10.

1 C 5001-01: Grading and culvert on 2000 Road near South Dakota Road northeast of Iola. J & J Contractors Inc., Iola, $235,798.30.

63 C 5082-01: Replace this bridge on 3000 Road over Illinois Creek in Montgomery County. B & B Bridge Company LLC, St. Paul, $988,276.50.

78 C 5116-01: Replace the 56th Avenue Bridge over Cow Creek. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $970,188.30.

Non-FA:

70-106 KA 6806-01: Concrete Pavement Patching on various bridges on I-70 in Ellsworth, Lincoln, and Saline Counties.

70-91 KA 6539-01: Lighting replacement at the K-267 interchange and the westbound rest area west of Ruleton. Phillips Southern Electric Company Inc., Wichita, $219,711.00

169-2 KA 6668-01: Microsurfacing on US 169 between Garnett and the Anderson/Franklin County Line. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $2,225,604.34

99-37 KA 6669-01: Chip seal on K-99 between US 400 and US 54. Circle C Paving and Construction LLC, Goddard, $679,802.82.

49-96 KA 6711-01: 2-inch milling and 1.5-inch HMA overlay from US 81 to US 160. Pearson, $2,537,466.00


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *