KDOT Lettings: February 2022

25 projects are up for bids at KDOT on February 16. The approved bids announced on March 2 are highlighted in red.The approved bids announced on March 31 are highlighted in blue.

Federal-Aid (unless noted)

10-23 KA 6281-01: Lighting upgrade on the K-10/E 1900 Road interchange between Lawrence and Eudora. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $224,350.00.

56-46 KA 6243-01: 2-inch milling and 2-inch HMA overlay on the state-maintained portion of the Shawnee Mission Parkway. Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $1,797,830.30.

24-52 KA 6240-01/24-23 KA 6239-01: HMA patching and 5/8-inch Ultrathin bonded asphalt surfacing on US 24-40 from K-32 near the Douglas/Leavenworth County Line to K-16 in Tonganoxie (the Douglas County portion is Non-FA) Superior Bowen, $1,204,750.44

87-58 KA 6314-01: Patching and 1.5-inch overlay along the entire length of K-87.
36-66 KA 6313-01/36-58 KA 6335-01: 2.5-inch milling and 2-inch overlay from K-87 in Marshall County to the west junction K-63 near Seneca (Marshall County segment is non-FA)
Hall Brothers Inc., Marysville, Kansas, $5,849,269.02

99-58 KA 6417-01/9-58 KA 6416-01: 1/2-inch milling and 1 1/2-inch HMA Overlay on K-99 from the North city limits of Frankfort to US 36. (K-9/K-99 concurrency segment north of Frankfort is Non-FA) Hall Brothers, $2,361,889.69

9-66 KA 6414-01/9-58 KA 6413-01: 2-inch milling and 1.5-inch HMA overlay on K-9 from K-87 in Marshall County to the south junction K-63 at Centralia (Marshall County segment is Non-FA)
63-66 KA 6415-01: 2-inch milling and 1.5-inch HMA overlay from the Pottawatomie/Marshall County Line to the south junction with K-9 at Centralia (Non-FA)
Hall Brothers, $6,515,375.84

81 U 2373-01: Safe Routes to School sidewalk improvements in Manhattan. Ebert Construction Co. Inc. & Subsidiary, Wamego, Kansas, $436,672.15

70-89 KA 6122-01: Repair of bridges along I-70 between 1st Street and Adams Street in Topeka. Wildcat, $5,574,579.70.

99-99 KA 6397-01: 2.5-inch milling and 2-inch HMA overlay from the West Junction with K-4 to the Wabaunsee/Pottawatomie County Line, excluding the segment through Alma and the new alignment that is currently under construction. Shilling Construction Co. Inc., Manhattan, $3,436,561.13

59 U 2371-01: Replace the Durst Street bridge over Black Kettle Creek in Moundridge. Ward Davis Builders Inc., Hutchinson, Kansas, $228,620.20.

146-67 KA 6134-01: Repair the K-146 bridge over Rock Creek. Detour via US 59, K-47, and K-3. Mission Construction Co. Inc., St Paul, Kansas, $287,182.86

14-78 KA 5798-01: Guardrail reconstruction on K-14/K-96 near South Hutchinson. Bettis Asphalt & Construction Inc., Topeka, Kansas, $311,580.73

61-78 KA 6135-01: Repair two sets of bridges on K-61 over the BNSF Railroad in Hutchinson

54-87 KA 6233-01: Repair the approaches to the bridges on Kellogg over Maize Road, Cowskin Creek, and Eastern Street in Wichita. Cornejo & Sons LLC, Wichita, Kansas, $843,538.80

Non-FA:

237-44 KA 6399-01: 1.5-inch milling and 1.5-inch overlay along the entire length of K-237. Bettis, $1,139,749.53

156-27 KA 5553-01: Add turn lanes to the K-156/K-14 intersection south of Ellsworth. Venture Corporation, Great Bend, Kansas, $1,337,145.50.

106 KA 6385-01: 1/2-inch milling and 1.5-inch HMA overlay on US 77 from US 56 to K-209 in Dickinson and Morris Counties, and the entire length of K-218. Shilling, $2,096,894.50.

69-61 KA 6524-01: Crack Sealing on US 69 from the Linn/Miami County Line to 367th Street. Scodeller Construction Inc., Wixom, Michigan, $304,284.75

105-104 KA 6373-01: Chip Sealing on K-105 from MP 0 to MP 9.831. Vance Brothers Inc And Subsidiary, Kansas City, Missouri, $288,285.50


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *