Kansas Highways

Welcome to Kansas Highways. As the name suggests, this site is a source of information on the Kansas State Highway system, past and present. For more information on how the route log is organized, see the about Kansas Highways page.

Coverage of KDOT Lettings

  • KDOT Lettings: June 2026

    There are two big-ticket items up for bid on June 17

    Federal-Aid:

    98 TE 0535-01: Sidewalk installation on Main Street from Railroad Avenue to Warren Avenue, Russell Avenue from 4th to 6th, the south side of Warren Avenue from Main Street East 1/2 block, and the North Side of Railroad Avenue from Main Street west 1/2 block.

    68-61 KA 2373-04 Reconstruction of K-68 to 4 lanes from US 169 north of Paola to US 69 in Louisburg

    61 TE 0529-01: Sidewalk Construction on new paths designated “John Brown Loop” and “South Levee Loop” in Osawatomie.

    77-18 KA 4137-01: Reconstruction of US 77 Between Arkansas City and Winfield. Includes a slight relocation to the east at 222nd Street.

    54-88 KA 6280-01: Signal upgrade at Pancake Boulevard and Western Avenue in Liberal.

    Federal-Aid, Local projects:

    89 C 5319-01: Improvements to two curves on the Willard-Rossville Road south of Rossville.

    72 C 5321-01: Reconstruction of 170th Road (RS 2039/Old US 81) between the Salina/Ottawa County Line and K-18.

    12 C 5347-01: Replace the bridge over Big Timber Creek on Road 30 in Cheyenne County

    Non-FA

    35-46 KA 7668-01: Replace a Dynamic Message Sign on I-35 near Johnson Drive

    106 KA 7454-02: Install Continuously Operating Reference Station Monuments at multiple KDOT Sub-area offices

    106 KA 7635-01: Signage Update on US 36 from K-87 in Marshall County to the Nemaha/Brown County Line, K-9 from K-87 in Marshall County to the Nemaha/Jackson County Line, K-63 from the Pottawatomie/Nemaha County Line to the Kansas/Nebraska State Line, The entire length of K-71, K-178, K-187, and K-236 in Nemaha County, The entire length of K-87, K-88, and K-110 in Marshall County, and the entire length of K-246 in Brown County.

    70-31 KA 7706-01: Lighting upgrades at I-70 Exit 313

    69-6 KA 7621-01: Repair and deck overlay on the Southbound US 69 bridge over the BNSF Fort Scott Subdivision South of Fulton

    106 KA 7646-01: Signage replacement on US 59, US 169, US 169B, K-31, and K-58 in Anderson County

    106 KA 7641-01: Signage replacement on US 81, US 160, US 166, K-44, and K-49 in Sumner County

    106 KA 7647-01: Signage replacement on US 160 from the Colorado/Kansas State Line to Johnson City, K-27 from US 160 to the Hamilton/Greeley County Line, and US 50 from the Colorado/Kansas State Line  to the Hamilton/Karney County Line

  • KDOT Lettings: May 2026

    There are 14 projects up for bid in May. Awarded Bids announce on May 29 are highlighted in red.

    Federal-Aid

    56 KA 7274-01: Reconstruction of Commercial Street between the Cottonwood River Bridge and Kansas Avenue in Emporia.

    97 C 5361-01: Replace the Road 23 Bridge over the Saline River in Thomas County

    19 TE 0575-01: Safe Routes to School sidewalk construction along 20th Street from Rouse Street to Meadowlark School. Mission Construction Co. Inc., St. Paul, $297,453.50.

    4 C 5344-01: Replace the Catalpa Road bridge over Spring Creek east of Sharon. L & M Contractors Inc., Great Bend, $366,484.40.

    73 C 5357-01: Replace the R Road bridge over Ash Creek northeast of Larned

    41 C 5318-01: Collector signage Updates in Haskell County. Martin, $59,894.25.

    Federal-Aid, Local Projects:

    92 C 5360-01: Replace the M Road Bridge over East Bever Creek west of Smith Center. L & M, $783,676.75.

    4 C 5322-01: Guardrail upgrades on Gyp Hill Road southwest of Medicine Lodge. L & M, $593,111.85.

    Non-FA:

    106 KA 7645-01: Signage upgrades on US 183 from the Rush-Ellis County Line to Plainville and the entire length of the US 183 Bypass, K-247, and K-255. Martin Outdoor Enterprises Inc., Pittsburg, $269,131.20.

    166-50 KA 7241-01: Guardrail upgrades along 5 bridges on US 166 in Labette County. Martin, $793,994.78.

    2-4 KA 7216-01: Bridge repair at 4 bridges on K-2 near Hazelton. Wildcat Construction Co Inc & Subsidiaries, Wichita, $1,862,679.26.

    4-5 KA 7217-01: Guardrail upgrades on K-4 near Claflin. Wildcat, $538,957.50.

    400-8 KA 7995-01: Rehabilitate five pipe culverts on US 400 in Butler County. US Infra Rehab Services, LLC, North Chesterfield, Virginia, $567,960.63.

    14-48 KA 7218-01: Guardrail upgrades on K-14 near Rago PSE Contractors LLC, Wichita, $277,661.60.

  • KDOT Lettings: April 2026

    The main project on the April lettings is a reconstruction of K-33 near Wellsville that features a pair of roundabouts. Also up for bids are several signage replacement projects.

    Awarded Bids announced on April 30 are highlighted in red.
    Awarded Bids annonced on May 29 are highlighted in blue.

    Federal-Aid:

    106 KA 7263-01: Reconstruct the intersection of 47th and Rainbow in Kansas City. Realm Construction, Inc., Blue Springs, Missouri, $317,306.30.

    79 C 5358-01: Bridge replacement over Salt Creek 2 miles east of Belleville (no plans provided) Reece Construction Company Inc. & Subs., Salina, $430,949.02.

    24-82 KA 6451-01: Reconstruct Main Street from Elm Street to Pleasant Street in Stockton Morgan Brothers Construction, La Crosse, Kansas, $1,931,460.66.

    1 TE 0567-01: Grading and Surfacing a pedestrian path on US 54 between State Street and Kansas Drive in Iola (no plans provided)  Bettis Asphalt & Construction Inc., Topeka, $12,250,137.64.

    33-30 KA 6472-01: Reconstruct K-33 from Shawnee Road to 8th Street in Wellsville. Includes a “Dogbone” Roundabout at the I-35 interchange and a regular roundabout at 10th Street/Stafford Road. Kings Construction Co. Inc., Oskaloosa, $19,235,787.63.

    42 C 5351-01: Replace a bridge over Sand Creek in Hodgman County L & M Contractors, Inc., Great Bend, Kansas, $688,412.50.

    Non-FA:

    106 KA 7639-01: Signage replacement in Marshall County: US 36 from the Washington/Marshall County Line to K-110; US 77 from the Riley/Marshall County Line to the Kansas/Nebraska State Line; K-9 from the Washington/Marshall County Line to Vermillion; K-99 from K-9 to the Kansas/Nebraska State Line; and the entire length of K-233. KOMO Construction LLC / DDA A&H Co., Elko New Market, Minnesota, $725,820.00.

    106 KA 7643-01: Signage replacement in Wyandotte County: US 69 from the Johnson/Wyandotte County Line to K-32 and from I-70 to the Missouri River; K-5 from 54th Street to I-635 and from I-635 to US 69; and K-32 from I-635 to US 69. Collins and Hermann Inc., St. Louis, Missouri, $678,900.00.

    106 KA 7674-01: DMS Signage upgrades and camera installations at 38 sites statewide. TLS Group Inc., Oklahoma City, Oklahoma, $782,925.70.

    111-27 KA 7222-01: Guardrail work on the bridge over East Spring Creek northeast of Ellsworth. Van Kirk Sand & Gravel Inc., DBA Van Kirk Bros. Contracting, Sutton, Nebraska, $294,806.90.

    153-59 KA 7223-01: Replace the guardrail on the K-153 bridge over Bull Creek in McPherson.  Reece, $123,425.33.

    106 KA 7636-01: Signage replacment in Washington County: US 36 from K-22 to the Washington/Marshall County Line; K-9 from K-15/K-148 to the Washington/Marshall County Line; K-15 from K-9/K-148 to the Kansas/Nebraska State Line; K-119 (entire length); K-148 from the Republic/Washington County Line to the Kansas/Nebraska State Line; K-234 (entire length); and K-243 (entire length) Cooper Construction LLC, Emporia, Kansas, $1,023,541.04.

    106 KA 7637-01: Signage replacement centered on Cloud County: US 24 from 65th Road to K-189; US 81 from the Ottawa/Cloud County Line to K-148 in Republic County; K-9 from 40th Road in Cloud County to Parallel Street in Clifton; and K-28 from the Jewell/Cloud County Line to K-9. Cooper, $1,585,798.25.

    106 KA 7644-01: Signage replacement in Osborne County: US 24 from 240th Avenue to the Osborne/Mitchell County Line; US 281 from Co 421 Drive to the North Junction with K-9; and K-181 from the Mitchell/Osborn County Line to 220 Road. KOMO, $285,803.83.

    24-97 KA 7221-01: Replace the Guardrail on the US 24 bridge over Prairie Dog Creek west of Colby. Sporer Land Development Inc., Oakley, $239,541.10.

    4-83 KA 7215-01: Extend a culvert running under the intersection of K-4 and County Road 320 in Rush County. Reece, $268,016.67.

    106 KA 7638-01: Signage replacment centered on Harper County: US 160 from the Barber/Harper County Line to the Harper/Sumner County Line; K-2 from the Barber/Harper County Line to K-42 un Sumner County; K-14 from US 160/K-2 to Rago in Kingman County; K-42 from K-2 in Sumner County to K-49 in Sedgwick County; K-44 from K-2 to the Harper/Sumner County Line; and the entire length of K-179. KOMO, $496,854.46.