Welcome
Welcome to Kansas Highways. As the name suggests, this site is a source of information on the Kansas State Highway system, past and present. For more information on how the route log is organized, see the about Kansas Highways page.
Kansas Highways by the Numbers
Links
- About Kansas Highways
- City Connecting Links
- Kansas/Missouri Exit Guides
- Kansas License Tags
- Missouri highways
- Missouri highway history
- KDOT Construction/Road Condition Data
- AARoads.com forum
Coverage of KDOT Lettings
The coverage of the KDOT lettings is compiled from publicly available sources.
-
KDOT Lettings: September 2024
Awarded bids announced on October 7 are highlighted in red. Awarded bids announced on October 30 are highlighted in blue.
77-58 KA 3924-01: Replace the US 77 bridge over Deer Creek west of Oketo—traffic to be carried via a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, Kansas, $2,708,367.10.
99-58 KA 5764-01: Replace the K-99 bridge over Jim Creek South of Frankfort. Ebert Construction Co Inc. & Subsidiary, Wamego, Kansas, $2,508,724.76.
77-58 KA 6897-01: Reconstruct 10th Street (US 77) in Marysville from the north end of the Union Pacific Bridge to Oak Street.
99 C 5238-01: Replace the Fairfield Road Bridge over Hendricks Creen north of Alma. King, $673,463.75.
9 TE 0533-01: Reconstruct Cottonwood Street in Strong City from 4th to 7th. Killough Construction, Inc., Ottawa,
$872,916.5631 C 5231-01: Replace a culvert on Old Milford Road. Bayer Construction Co. Inc., Manhattan, $536,461.18
45 C 5232-01: Replace the 100 Road bridge over Limestone Creek. L & M Contractors Inc., Great Bend, Kansas, $710,551.00
18-53 KA 5713-01: Replace a culvert on K-18 east of Beverly. Klaver Construction Company Inc., Wichita, $1,105,443.78.
40-100 KA 7313-01: Superelevated Corrections, a 2.5 inch mill and inlay, a 3-foot addition of 8” thick shoulders, and a 1.5” Overlay from the Colorado State Line to the east city limits of Sharon Springs
40-100 KA 7316-01: Superelevated Corrections, a .5 inch mill and 2.0” inlay, and 3-foot addition of 8” thick shoulders, and a 1.5” Overlay from Sharon Springs to Pebble Road in Wallace County
APAC-Kansas Inc. Shears Division, Hutchinson, $11,168,116.393-19 KA 7450-01/3-6 KA 7449-01: 1-inch milling and 1.5-inch HMA overlay from K-47 in Crawford County to K-39 in Bourbon County (Bourbon County segment is non-FA) APAC-Kansas, $1,642,155.29
7-19 KA 7451-01: 3-inch milling and 3-inch HMA overlay from US 400 to Girard. 3-inch milling and 4-inch overlay at K-126 junction. APAC-Kansas, $3,868,907.87.
50 C 5222-01: Replace the 25000 Road bridge over the Neosho River east of Parsons. B & B Bridge Company LLC, St. Paul, $525,146.05.
103 U 2404-02: Safe Routes to School sidewalk improvements in Neodesha. Heck & Wicker Inc., Parsons, $634,114.30.
56-5 KA 6363-01: Reconstruct sidewalk ramps and install new traffic signals at US 56 and McKinley Street in Great Bend. Phillips Southern Electric Company Inc., Wichita, $899,021.50.
54-8 TE 0508-01: Construct a new bridge for the Redbud Trail over US 54 near Ramona. Dondlinger & Sons Construction Co.
Inc., Wichita, $1,533,312.9587 N 0727-01: Reconstruct a portion of Nelson Drive in Derby. Includes a roundabout at Venture Lane. Pearson Construction LLC, Wichita, $7,318,642.00
93 C 5237-01: Replace the NE 130th Avenue bridge over Rattlesnake Creek. The old bridge is a timber structure. L & M, $663,989.00.
81-96 KA 5772-01: Replace the US 81 bridge over Bluff Creek south of Caldwell. Full Closure during part of the project, detour via OK 11, OK 132/K-179, K-44, and K-49. King, $4,983,484.43.
156-28 KA 5759-01: Replace the K-156 bridge over the Pawnee River. Traffic is to be carried via a Shoo-Fly Detour. L & M, $2,434,928.38.
156-42 KA 5802-01: Shoulder Widening and pavement refresh of K-156 from 214 Road to 228 Road in Hodgeman County. Work is mainly to be done in segments no more than one mile with one-lane traffic controlled by signals or Pilot car. There is a segment that will require K-156 to be completely closed – Detour via K-23, US 50, and US 283. Venture Corporation, Great Bend, $21,508,140.12.
Federal-Aid, Local projects
99 C 5193-01: Pavement Marking on Mission Valley Road in Wabaunsee County from K-4 to Harveyville Road. Heartland Traffic Services Inc., Kansas City, Kansas, $360,113.00.
74 C 5227-01: Replace the Kiowa Road bridge over West Cedar Creek. L & M Contractors Inc., Great Bend, $547,817.15.
24 C 5199-01: Improvements to 260th Road from the Kiowa/Edwards County Line to S Road, and 270th Road from S Road to US 50. Venture, $871,453.80.
Non-FA:
106 KA 7238-01: Sidewalk improvments at K-92 and 19th Street in Leavenworth, and on K-9 in Whiting at 2nd and 3rd Streets. Multicon Inc., Park City, $201,228.58.
106 KA 7454-01: Improvements at multiple continuously operating reference station sites. Phillips Southern, $343,805.00.
16-106 KA 7469-01: Full-depth HMA patching, 1-inch cold milling, 1.5-inch HMA Overlay, adding a 2-foot wide and 8-inch HMA shoulder extension and placing a rock pavement edge wedge on K-16 from K-92 in McLouth to US 24 in Tonganoxie. J M Fahey Construction Company, Grandview, Missouri, $4,095,096.00.
69-105 KA 6964-01: Bridge repair on the 18th Street Expressway bridge over Merriam Lane and Turkey Creek. PCI Roads, LLC, Saint Michael, Minnesota, $773,608.50
82-14 KA 6721-01: Extend an existing Concrete culvert taking K-18 and Osage Road over Cane Creek. Reece Construction Company, Inc., Salina, $793,520.47
70-26 KA 6954-01: Bridge repair on the westbound I-70 bridge over old US 40 and the UP Sharon Springs Subdivision. Wildcat Construction Co Inc. & Subsidiaries, Wichita, $425,300.50.
106 KA 6862-01: Signage upgrade in Bourbon County on all highways except for US 69 and K-7 south of Fort Scott. Collins & Hermann Inc., Kansas City, Kansas, $2,100,000.00.
77-8 KA 7456-01: Ultrathin bonded asphalt surfacing on US 77 from I-35 to the Butler/Marion County Line. Pearson, $2,365,085.02.
15-18 KA 7432-01: Chip seal on K-15 from US 166 to US 160. Circle C Paving and Construction LLC, Goddard, $514,362.30.
81-87 KA 7458-01: PCCP patching on US 81 from Grand Street in Haysville to 59th Street South. Interstate Improvement Inc., Faribault, Minnesota, $939,539.50.
55-106 KA 7048-01: Surface recycle and chip seal along the entire length of K-55 (No plans) Dustrol Inc., Towanda, $1,446,680.83
27-65 KA 7467-01/27-94 KA 7466-01: Surface recycle and chip seal on K-27 from US 56 to US 160, excluding the K-27/K-51 concurrency. Dustrol, $5,105,633.47
-
KDOT Lettings: August 2024
Here’s what’s up for bids at the August lettings. Awarded bids announced on September 9 are highlighted in red. Awarded Bids announced on October 7 are highlighted in blue.
Federal-Aid
63-66 KA 5729-01: Replace the K-63 bridge over Turkey Creek 7.64 miles north of US 36 and south of K-71. One lane of traffic is to be maintained and controlled by traffic signals. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $5,724,952.34.
141-27 KA 5723-01: Replace the K-141 bridge over the Union Pacific just south of K-140. Detour via K-140, K-156, and K-4. Dondlinger & Sons Construction Co. Inc., Wichita, $5,729,590.74.
281-71 KA 6020-01: reconstruction to add shoulders and replace the North Fork Solomon River Bridge on US-281 between the north US-24/US-281 junction north to the south city limits of Portis. King Construction Company Inc. & Subsidiaries, Hesston, $18,892,764.37.
84 C 5196-01: Major collector signage upgrades in Russell County, generally west of US 281 and north of I-70. KOMO Construction LLC / DBA A&H Co., Elko New Market,
Minnesota, $219,268.00.92 C 5236-01: Replace the bridge on W Road over West Oak Creek in Smith County. L & M Contractors Inc., Great Bend, $597,099.00.
160-4 KA 7429-01: 1.5-inch milling and 1.5-inch Overlay on US 160 from the Comanche/Barber County Line to Medicine Lodge
281-4 KA 7430-01: 1.5-inch milling and 1.5-inch overlay on US 281 from the Oklahoma/Kansas State Line north to US 160
Venture Corporation, Great Bend, $7,880,767.90.4 TE 0527-01: Sidewalk upgrades on Iliff Avenue (US 281) from Second to El Dorado Avenue, and on El Dorado from Iliff to Oak. Barkley Construction LLC, Wichita, $499,989.05
73 C 5224-01: Replace the 40th Avenue bridge over Ash Creek. L & M Contractors, $538,595.10.
281-76 KA 6895-01: Reconstruction of a two-block segment of Main Street in Pratt. Morgan Brothers Construction, Inc., Lacrosse, $510,578.79.
78 C 5198-01: Major collector signage upgrade in Reno County west of K-14. KOMO Construction LLC/DBA A&H Co., Elko New Market, Minnesota, $474,232.00.
68 C 5225-01: Replace a timber bridge west of Ness City with a pre-cast concrete bridge. L & M Contractors, $362,626.00.
Federal-Aid, Local projects
75 C 5228-01: Replace the Armstrong Road bridge over Vermillion Creek. Ebert Construction Co. Inc. & Subsidiary, Wamego, $670,069.63.
75 C 5279-01: Rehabilitation of the Schoeman Road bridge over the Kansas River between St. Marys and Wamego. A M Cohron & Son Inc., Atlantic, Iowa, $11,206,043.60.
62 C 5194-01: Guardrail improvements on 130 Road on the west side of Wakonda Lake L & M Contractors, $1,446,220.00.
77 C 5234-01: Bridge replacement west of Atwood. L & M, $448,408.60.
82 C 5235-01: Bridge replacement southeast of Plainville. Klaver Construction Company Inc., Wichita, $289,698.67.
10 C 5220-01: Bridge replacement southeast of Ceder Vale. Reece Construction Company, Inc., Salina, $467,026.75.
48 C 5230-01: Bridge replacement on NE 10th Road (old US 54) over a tributary to Smoots Creek east of Kingman. King, $433,050.70.
Non-FA:
63-66 KA 7437-01: Chip Seal on K-63 from K-9 to US 36. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $1,172,464.73.
106 KA 7441-01: Chip Seal on US 159 from Nortonville to Effingham and K-116 from K-16 to US 59. Vance Brothers, $1,223,751.04.
24-15 KA 7399-01: Crack Sealing on US 24 from US 81 to the Cloud/Clay County Line. Pavement Pro’s LLC, McPherson, $235,771.39.
106 KA 7401-01: Chip Seal on K-128 from US 24 to US 36, as well as the entire length of K-228. Dustrol Inc., Towanda, $2,238,399.05.
18-84 KA 7407-01: Chip Seal on K-18 from US 281 to the Russell/Lincoln County Line. Dustrol, $3,585,150.48.
24-106 KA 7411-01: Chip Seal on US 24 from Stockton to MP 171.7. Circle C Paving and Construction LLC, Goddard, $845,117.90.
69-6 KA 7446-01: Crack Sealing on US 69 in Fort Scott. Pavement Pro’s, $81,593.32.
106 KA 6860-01: Signage Upgrade primarily in Seward County. The short segment of US 270 is still relatively well marked and is signed east-west despite being concurrent with north-south US 83 for its entire length in Kansas. Martin Outdoor Enterprises Inc., Pittsburg, Kansas, $944,000.00
56-106 KA 7433-01: Chip Seal on US 56 from Rolla to Hugoton. Heft and Sons LLC, Greensburg, $1,191,226.00.
-
KDOT Lettings: July 2024
Awarded bids announced on July 29 are highlighted in red.
Awarded bids announced on September 9 are highlighted in blue.Federal-Aid:
7 C 5217-01: Replace a culvert on 220th Street over an unnamed stream southwest of Fairview
26 C 5221-01: Replace the 370th Avenue bridge over Big Creek South of Walker
69-19 KA 7352-01: Pavement marking from the US 400/K-171 junction to the north Junction with US 160 in Pittsburg. Cillessen And Sons Inc., Kechi, Kansas, $495,614.50.
135-87 KA 6978-01: Bridge painting on the 77th Street bridge over I-135 in Valley Center. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $851,914.82
183-49 KA 6945-01: Bridge repair on two US 183 bridges 4 and 6 miles north of Greensburg
87 N 0693-01: Reconstruction of Oliver Avenue and Kechi Road in Kechi. Conspec Inc. DBA Kansas Paving, Wichita, $1,998,226.10.
68 C 5126-01: Guardrail upgrades on two County bridges in western Ness County. L & M Contractors Inc., Great Bend, $239,593.00.
Federal-Aid, local projects
56 C 5188-01: Reconstruction of F Road between Americus and US 56. Ebert Construction Co. Inc. & Subsidiary, Wamego, $1,033,661.58.
28 C 5201-01: rumble strip grinding, pavement marking, and installation of stop signs with integrated LEDs along VFW road on the west side of Garden City. Phillips Southern Electric Company, Inc., Wichita, $396,565.90.
Non-FA:
59-3 KA 7381-01: Crack sealing on US 59 from Nortonville to Atchison. Pavement Pro’s LLC, McPherson, $70,077.00.
35-70 KA 6075-02: Guardrail updates on I-35 in Osage County. J & J Contractors Inc., Iola, $603,559.53.
24-106 KA 7345-01: Crack Sealing on US 24 from K-32 to Bonner Springs. Pavement Pro’s, $209,567.52.
106 KA 7447-01: Mudjacking in multiple locations in Marshall, Pottawatomie, Riley, Jackson, Lyon, Doniphan, Brown, and Nemaha counties. Raising Solutions LLC, Jefferson City, Missouri, $164,200.00.
106 KA 7448-01: Mudjacking across various locations in Douglas, Shawnee, Johnson, and Wyandotte Counties. URETEK USA, Inc., Tomball, Texas, $611,075.00.
169-105 KA 6960-01: Bridge repair on the Southbound 7th Street Trafficway bridge over the Kansas River in KCK. RA Knapp Construction Inc., Lenexa, Kansas, $83,570.00.
81-79 KA 7374-01: Chip seal from Belleville to the Kansas/Nebraska State Line. Dustrol Inc., Towanda, $2,468,630.00.
36-79 KA 7382-01: 1.5-inch Milling and 1.5-inch HMA Overlay on US 36 from the Jewell/Republic County Line to Belleville. Hall Brothers Inc., Marysville, $3,146,540.95.
81-106 KA 7361-01: Concrete Pavement patching on US 81 near the Ottawa/Republic County Line. Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $1,086,244.90.
15-106 KA 7364-01: Crack Sealing on K-15 from K-18 to Clay Center. Pavement Pro’s, $130,671.32.
77-106 KA 7368-01: 3/4-inch milling and 1.5-inch HMA overlay on US 77 from the first Marion/Morris County Line to Junction City. Shilling Construction Co. Inc., Manhattan, Kansas, $3,072,846.91.
106 KA 7385-01: Chip Seal on US 36 from Belleville to K-22 in Washington and Republic Counties and along the entire length of K-139. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $864,167.88.
166-11 KA 7383-01: 1-inch milling and 1.5-inch HMA overlay from K-26 to the Missouri State Line. Emery Sapp, $412,246.08.
35-30 KA 6076-02: Guardrail updates on I-35 in Franklin County south of Ottawa J & J Contractors, $1,154,405.00.
35-30 KA 6367-02: Guardrail updates on I-35 in Franklin County north of Ottawa. J & J Contractors, $1,155,652.08.
35-61 KA 6366-02: Guardrail updates on I-35 in Miami County. J & J Contractors, $477,664.27.
166-63 KA 6465-01: Replace the guardrail on a bridge just west of US 75 and at a curve at the US 75 junction. B & B Bridge Company Llc, St. Paul, Kansas, $480,116.17.
106 KA 7390-01: RAP sample milling in various locations in KDOT District 4. Dustrol, $23,581.24.
254-8 KA 7367-01: Crack Sealing on a 2.5-mile stretch of K-254 near the K-196 interchange. Pavement Pro’s, $70,197.18.
1-17 KA 7377-01: Crack Sealing along the entire length of K-1. Pavement Pro’s, $63,998.82.
160-17 KA 7389-01: Crack sealing on US 160 in Comanche County. Pavement Pro’s, $280,649.85.
160-39 KA 7329-01: Crack Sealing on US 160 from the Barber/Harper County Line to K-2 Pavement Pro’s, $113,405.28.
2-39 KA 7332-01: Crack Sealing on K-2 from Anthony to K-14 (part of this section is concurrent with US 160) Pavement Pro’s, $65,682.00.
56-80 KA 7331-01: Crack Sealing on US 56 from Lyons to the Rice/McPherson County Line. Pavement Pro’s, $135,974.60.
183-83 KA 7330-01: Crack Sealing on US 183 from the Pawnee/Rush County Line to La Crosse. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, Kansas, $2,020,615.37.
-
KDOT Lettings: June 2024
The June lettings include the widening of the western leg of the South Lawrence Trafficway, along with several pavement marking and bridge repair projects. Awarded bids announced on July 8th are highlighted in red. The Lawrence Times reported on the awarded bid for the South Lawrence Trafficway project on the 3rd. Awarded bids announced on July 29th are highlighted in blue
Federal-Aid
3 TE 0537-01: Safe Routes to School sidewalk project in Atchison, primarily Santa Fe Street from 10th to 15th and 14th from Main to Atchison Street. Julius Kaaz Construction Co. Inc., Leavenworth, $979,077.00.
40-23 KA 3634-03: Widening of the South Lawrence Trafficway from 2 lanes to 4 from 6th Street to Iowa Street in Lawrence. Emery Sapp & Sons Inc. And Subsidiaries, Columbia, Missouri, $170,597,911.20
7-46 KA 6797-01: Bridge repair on the Old 56 bridge (which is still in KDOT’s purview as part of K-7) over the BNSF Emporia Sub in Olathe. Pyramid Contractors Inc. and Pyramid Properties Inc., Olathe, $647,140.60
9-66 KA 6439-01: installation of new curbing and a new sidewalk along the south side of John Riggins Avenue from 3rd through 6th in Centrallia. Ebert Construction Co. Inc. and Subsidiary, Wamego, $1,065,137.42
70-89 KA 7350-01: Pavement Marking on I-70 from Valencia Road to I-470 in western Shawnee County. Cillessen and Sons, Inc., Kechi, $302,397.36
105 N 0739-01: Reconstruction of 138th Street from K-32 to Morse Avenue. VF Anderson Builders LLC, Harrisonville, Missouri, $4,215,551.68
24-82 KA 5754-01: Replace the Main Street bridge over Dibble Creek in Stockton. One lane traffic controlled by signal to be maintained on Main Street. Klaver Construction Company, Inc., Wichita, $2,310,818.48
23-90 KA 6019-01: Reconstruction of K-23 from US 24 in Hoxie South ~ 8 miles. Detour via I-70, US 83, and US 24. Sporer Land Development Inc., Oakley, $19,012,746.87
68-61 KA 7306-01: Pavement marking at the roundabout junction with Old Kansas City Road. Heartland Traffic Services Inc, Kansas City, $26,762.75
59-50 KA 7307-01: Pavement Marking at the roundabout junction with US 160. Heartland, $38,580.25
69A-11 KA 7308-01: Pavement Marking at the roundabout junction with K-66. Heartland, $35,322.00
400-103 KA 7309-01: Pavement Marking at the roundabout junction with K-47. Cillessen, $47,503.75
(the above four projects were initially scheduled to be let in April and were “tied,” meaning that an interested contractor would have to bid on all four projects. This time around, the projects are not tied)
4-83 KA 7318-01/4-5 KA 7320-01: Pavement Marking on K-4 from US 183 to the west junction with US 281 in Rush and Barton Counties
281-5 KA 7319-01: Pavement marking on US 281 from the east junction with K-4 to the Barton/Russell County Line
Roadsafe Traffic Systems, Inc., Chicago, $578,466.704-5 KA 7321-01: Pavement Marking on K-4 from the east junction with US 281 to the Barton/Rice County Line. Cillessen, $207,551.70.
135-40 KA 0052-01: Reconstruction of the interchange with SE 36th Street interchange in Newton Pearson Construction LLC, Wichita, $16,534,022.31
14-80 KA 7322-01: Pavement marking on K-14 from the North City Limits of Lyons to the Rice/Ellsworth County Line. Roadsafe, $230,360.50
Federal-Aid, Local Projects
8 C 5218-01: Replace the Prairie Creek Road bridge over Eightmile Creek. King Construction Company Inc. and Subsidiaries, Hesston, $767,949.00
Non-FA
59-44 KA 7333-01: Crack Sealing on US 59 from the North City Limits of Oskaloosa to the Jefferson/Atchison County Line
92-44 KA 7353-01: Crack Sealing on K-92 from the North City Limits of McLouth to the Jefferson/Leavenworth County Line
4-44 KA 7354-01: Crack Sealing on K-4 from K-92 to US 59
Pavement Pro’s LLC, McPherson, $282,311.0224-89 KA 7340-01: Crack Sealing on US 24 from the Pottawatomie/Shawnee County Line to Silver Lake, and from Menoken Road to Rochester Road in Topeka. Pavement Pro’s, $119,091.64
106 KA 7335-01: Crack sealing on US 75 from US 56 to I-470 in Osage and Shanee Counties and on K-4 from the Wabunsee/Shawnee County Line to Auburn Road, Pavement Pro’s, $257,063.21.
32-106 KA 7355-01: Crack Sealing on K-32 from US 24 to Bonner Springs (mostly in Leavenworth County, but also includes the brief segment of K-32 in Douglas County) Pavement Pro’s, $185,208.62.
70-27 KA 7231-01: Lighting upgrades at the rest area on I-70 just west of the K-156 interchange. Phillips Southern Electric Company Inc., Wichita, $113,216.00
56-57 KA 7349-01: 1-inch milling, 1-inch RCI, and 3-inch overlay on US 56-77 near Lincolnville. Shilling Construction Co. Inc., Manhattan, $1,334,751.46
54-37 KA 7068-01: Bridge repair on the US 56 bridge over the Verdigris River northwest of Toronto. One lane of traffic is to be maintained and controlled by signals. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $178,849.29
69-54 KA 6735-01: Bridge repair on the northbound US 69 bridge over the Marais Des Cynges River near Trading Post. One lane of northbound traffic to be maintained on the northbound bridge (southbound traffic is unaffected). Bettis Asphalt & Construction Inc., Topeka, $477,049.80
39-103 KA 6728-01: Bridge repair of the K-39 bridges over Snake Creek and the Verdigris River near Benedict. One lane of traffic is to be maintained controlled by traffic signals. Wildcat Construction Co. Inc. & Subsidiaries, Wichita, $1,243,678.64
106 KA 6863-01: Signage upgrade on Kellogg from Hillside to Greenwich and K-96 to the Sedgwick/Butler County Line; K-15 from K-53 to I-135; and K-96 from 21st to Kellogg. Cooper Construction LLC, Emporia, $2,605,955.08
160-96 KA 6941-01: Bridge repair on the US 160 bridge over the Union Pacific Railroad in Wellington Wildcat, $523,379.99
56-95 TE 9605-01: Construction of new pedetrian and bicycle paths along US 56 between South Polk Street and South Main Street in Hugoton. Multicon Inc., Park City, $580,671.01
-
KDOT Lettings: May 2024
Awarded Bids announced on June 6 are highlighted in red. Awarded bids announced on July 8 are highlighted in blue.
Federal-Aid:
70-89 KA 6932-01: Deck patching on the California Avenue bridge over I-70 in Topeka. Bettis Asphalt & Construction Inc., Topeka, $332,976.37.
4-89 KA 6933-01: Repair the approaches to the Oakland Expressway bridges over 6th Street in Topeka. Bettis, $622,444.34.
89 TE 0505-02: Bike route improvements in Topeka. Julius Kaaz Construction Co. Inc., Leavenworth, $598,598.00.
24-62 KA 6437-01: Reconstruction of Wisconsin Street in Cawker City
69-6 KA 6738-01/69-54 KA 6791-01: 2.5-inch milling and 2.5-inch HMA overlay on US 69 from Wall Street in Fort Scott to the E 1350 Road bridge north of Pleasanton. Pearson Construction LLC, Wichita, $17,576,896.63.
69-6 KA 6738-03/69-54 KA 6791-03: Guardrail update in the same area of US 69 (Non-FA) Bettis, $1,042,353.38.
400-11 KA 2375-10: Construct a passing lane on US 400 at East 50th Street southwest of Pittsburg. Bettis, $7,158,505.35.
75-63 KA 5699-01: Replace the US 75 bridge over Cheyenne Creek north of Caney. Traffic is to be carried on one lane controlled by traffic signals. Bridges Inc., Newton, $3,788,843.79.
77-18 KA 6766-01: Repairs to the bridge over the BNSF railway in Arkansas City. PCI Roads, LLC, Saint Michael, Minnesota, $1,192,103.58.
106 KA 6261-01: Signage updates in Butler County. Cooper Construction LLC, Emporia, $2,358,425.50.
96 TE 0506-01: Sidewalk installation on 16th Street in Wellington. APAC-Kansas Inc. Shears Division, Hutchinson, $420,521.65.
96 TE 0509-01: Construct a new walking loop around Watson Park, along the east side of Logan Street, a crosswalk across Logan at 7th Avenue, and a one-block segment of 4th Avenue between Merchant and Main Streets. Barkley Construction LLC, Wichita, $610,649.40.
106 KA 6264-01: Signage upgrade in Finney County: US 50/400 from Holcomb to the Finney/Gray County Line, US 83 from US 83B to the Finney/Scott County Line, the entire lengths of US 50B and US 83B, and K-156 from the Garden City bypass to the West Junction with K-23. Fulsom Brothers, Inc., Cedar Vale, Kansas, $1,590,013.36.
Non-FA:
36-7 KA 6948-01: Bridge repair on the King Fisher Road/12th Street Bridge over US 36 and the US 36 bridge over Linden Road in Hiawatha. PCI Roads, $334,004.35
36-22 KA 6588-02: Guardrail upgrades at the US 36 interchanges between Wathena and Elwood. Bettis, $526,527.25.
900-44 KA 6734-01: Bridge repair on the Westlake Road bridge over the west arm of Perry Lake. The bridge is to be closed during construction. Detour via US 24, K-4, and 81st Street. The detour is labeled as K-237, although the bridge is north of the north end of K-237. PCI Roads, $265,547.46.
31-70 KA 7326-01: 2-inch milling and 2-inch HMA overlay on K-31 in Melvern. 2-inch HMA overlay from US 75 to Melvern, and from Melvern to I-35. Bettis, $1,982,004.90.
70-105 KA 6750-01: Bridge repair on the eastbound I-70 approach to the Lewis and Clark Viaduct. I-70 and the Minnesota Avenue ramp to the Lewis and Clark Viaduct to be closed, detour via I-670. The Washington Boulevard ramp to the Lewis and Clark viaduct, and the eastbound Lewis and Clark itself, will remain open. PCI Roads, $277,270.95.
106 KA 6861-01: Signage update in Chase County. Cooper, $266,649.22.
106 KA 7328-01: RAP Sample milling in KDOT District 3. APAC-Kansas, $30,630.05.
35-30 KA 6843-01: Replace a butterfly sign pole between the 15th Street/Marshall Road and K-68 interchanges on I-35 in Ottawa. Phillips Southern Electric Company Inc., Wichita, $174,027.44.
177-08 KA 6940-01: Bridge repair on the bridges over the BNSF Emporia Sub and Durechen Creek on the north end of El Dorado Lake. PCI Roads, $1,550,203.38.
1-17 KA 6603-01: Widen two adjacent culverts at the Crossing with the Salt Fork of the Arkansas River near MP 7.5. Traffic is to be carried on a shoo-fly detour. Reece Construction Company, Inc., $1,994,813.50
56-80 KA 6455-01: Re-grading and guardrail upgrades west of Lyons
-
KDOT Lettings: April 2024
Here are the projects scheduled to be up for bids on April 17. Awarded Bids announced on May 6 are highlighted in red. One Awarded bid announced on July 8 is highlighted in blue.
Federal-Aid
23 TE 0517-01: New Sidewalk along the west side of Church Street from 15th Street to 20th Street in Eudora, including on the bridge over K-10. Miles Excavating, Inc., Basehor, $1,145,158.48.
66 C 5195-01: Major collector signage upgrade in Northern Nemaha County. KOMO Construction LLC / DBA A&H CO., Elko New Market, Minnesota, $218,746.60.
81 TE 0525-01: Reconstruction and storm sewer updates on Juliette Avenue from Pierre Street to Poyntz Avenue in Manhattan
232-27 KA 5724-01: Replace the culvert over Wilson Creek just north of Wilson in kind. One lane of traffic through the work zone controlled by temporary traffic signals. L & M Contractors Inc., Great Bend, $1,080,721.50.
64 U 2402-02: Sidewalk Construction on Chataqua Street, Hall Street, Main Street, 3rd Street, 8th Street, and 9th Street in Council Grove. Bettis Asphalt & Construction Inc., Topeka, Kansas, $907,401.95.
70-91 KA 7200-01: 2.5-inch milling and 2-inch HMA overlay from Exit 12 to Exit 27 near Goodland. Venture Corporation, Great Bend, $6,896,798.33.
69-11 KA 7308-01/59-50 KA 7307-01/68-61 KA 7306-01/400-103 KA 7309-01: Pavement marking at four roundabouts in KDOT District 4: US 69A/400 at K-66, the North junction of US 59 and US 160, K-68 at Old Kansas City Road, and US 400 at K-47(re-bid and awarded as part of the June 2024 lettings)37 C 5197-01: Major collector signage upgrade on Major collector routes east of K-99 in Greenwood County. Signs Up LTD DBA Haren’s Trees and Critters, Webster City, Iowa, $369,933.80.
183-49 KA 6945-01: Bridge repair on the bridge over the South Branch Rattlesnake Creek north of Greensburg
106 KA 6262-01: Signage upgrade at the I-135/Kellogg interchange and on K-254 in Sedgwick County. Fulsom Brothers, Inc., Cedar Vale, $1,480,585.00.
96-68 KA 7107-01: 1/2-inch milling and 1.5-inch HMA overlay from the Lane/Ness County line to Ness City. 1.5-inch milling and 1.5-inch HMA overlay in Ness City. Venture, $4,084,078.39.
Federal-Aid, Local projects
54 C 5081-01: Replace a bridge on a local road over the BNSF Fort Scott Subdivision northwest of La Cynge. Dondlinger & Sons Construction Co. Inc., Wichita, $1,991,283.58.
Non-FA:
24B-91 KA 7106-01: 2-inch milling and 2-inch HMA overlay on the entire length of US 24B in Goodland. Venture, $928,933.10.
35-30 KA 6536-01: Repair of pipe culverts along I-35 from Williamsburg to Ottawa. L Underwood LLC, Ottawa, $803,113.89.
39-103 KA 6728-01: Bridge repair on the bridge over Snake Creek on K-39 west of Benedict
900-8 KA 6765-01: Bridge repair on the Myers Road bridge over the BNSF Emporia Sub on the west side of the El Dorado Lake dam. Wildcat Construction Co Inc & Subsidiaries, Wichita, $96,870.00.
135-87 KA 6769-01: Bridge repair on the 45th Street bridge over I-135 on the north side of Wichita. Highway Heavy Repair LLC, Rogers, Minnesota, $641,031.30.
235-87 KA 6771-01: Bridge repair on the ramp from Northbound I-235 to westbound K-96 in north Wichita Wildcat, $293,464.00.
96-51 KA 6607-02: Guardrail update near the K-96/Gage Road intersection in Lane County. Bettis, $232,350.25.
-
KDOT lettings: March 2024
Federal-Aid:
7-22 KA 5722-01: Replace bridge over Mill Creek southeast of White Cloud. One lane traffic to be maintained, controlled by traffic signals.
435-46 KA 4275-02: Rehabilitation work on the I-435 bridges over Midland Drive in Shawnee and full-depth replacement of Midland Drive under 435.
66 TE 0531-01: New sidewalk along Oregon Street in Seneca
75-89 KA 6740-01/75-89 KA 6930-01: Bridge repair on the Southbond Westgate Bridge and the bridge over I-70 on the ramp from Southbound US 75 to eastbound I-70/Gage.
4-85 KA 5719-01: Replace the overpass of I-135 at the north junction of I-135 and K-4 and the bridge over Dry Creek near the K-4/K-104 junction. Detour at I-135 via K-104 and the south I-135/K-4 junction.
135-85 KA 6946-01: Bridge repair on Southbound I-135 over a Dry Creek drainage tributary in Salina.
27-100 KA 6778-01: Bridge repair on Bridge 17 north of Sharon Springs
106 KA 6260-01: Signage replacement along all of the US highways in Montgomery County
2-4 KA 5706-01: Bridge replacement over Little Mule Creek west of Kiowa. Detour via US 281, OK 11, OK 8, and K-8
18 TE 0536-01: New sidewalk along US 160 from Mound Street to Wheat Road in Winfield
160-39 KA 5725-01: Replace the Sand Creek bridge east of Harper. Detour via K-2, K-42, and K-49
54-48 KA 6056-01: reconstruction of US 54/400 between the east Junction of K-14 and the Kingman-Sedgwick County Line
42-76 KA 6058-01: Reconstruction of Broadway in Sawyer. Detour via US 281, US 54, and K-14
Non-FA:
435-105 KA 6892-01: Replace a damaged Cantilever sign gantry on Southbound I-435 at K-32
435-105 KA 6931-01: repaint the I-435 bridges over I-70
84 TE 9301-01: New sidewalk along the north side of 8th Street/State Street from Fossil Street to Russell High School
35-16 KA 7299-01/35-70 KA 7298-01: Concrete patching on I-35 in Coffey and Osage Counties
68-61 TE 9403-01: New Pedestrian HAWK signal on K-68 at Summerfield Drive/Aquatic Drive in Louisburg
400-49 KA 7296-01: 1.5-inch milling and 1.5-inch HMA overlay on US 400 from the Ford/Kiowa County Line to US 54.
54-87 KA 6937-01: Repair the bridges at the Kellogg/Ridge Road interchange
106 KA 6781-01: Repair three bridges: one on US 283 in Ford County, one on US 283 in Jetmore, and one on K-156 in Hodgeman County
-
KDOT Lettings: February 2024
Awarded bids announced on March 8 are highlighed in red.
Federal-Aid:
35-46 KA 7190-01: PCCP Patching and 4-inch HMA overlay on Southbound I-35 from I-635 to 95th Street, including the exit ramps to Shawnee Mission Parkway and Antioch. PCCP patching (no overlay) on the exit ramps to 67th and Johnson Drive. Superior Bowen Asphalt Company LLC, Kansas City, Missouri, $12,169,170.25.
99-99 KA 2603-03: Reconstruction of K-99 from I-70 north 2 miles. Ebert Construction Co. Inc. & Subsidiary, Wamego, $11,020,025.43.
99-99 KA 5728-01: Replace a bridge over a Dragoon Creek drainage tributary south of Eskridge. King Construction Company Inc. & Subsidiaries, Hesston, $3,075,482.97.
70-105 KA 6928-01: Repair the bridge on the ramp from WB I-70 to northbound I-435 over the ramp from northbound I-435 to eastbound State Avenue. WB I-70 to Northbound I-435 ramp closed, detour to 110th Street and turnaround. Westbound I-70 to eastbound State Avenue to remain open. Comanche Construction Inc., Olathe, $440,243.76.
70-27 KA 5765-01: Replace I-70 bridges over Elkhorn Creek just east of the K-156 interchange. Ramp closure from K-156 to eastbound I-70; Detour via westbound I-70 to K-14 and turn around or via K-14 at Ellsworth. Bridges Inc., Newton, $6,168,427.54.
4-85 KA 5721-01: Replace a wood bridge over Gypsum Creek on a field entrance along K-4 southeast of Gypsum. L & M Contractors Inc., Great Bend, $90,682.00.
27-91 KA 6123-01: Bridge repair over the Kyle Railroad in Goodland. Bridges Inc., $1,257,728.50.
54-37 KA 5760-01: Replace the bridge over Burnt Creek ~ 10 miles west of Eureka and shift the intersection with D50 road to the east. Traffic to be carried on a shoo-fly detour. B & B Bridge Company LLC, St. Paul, Kansas, $2,369,167.50.
169-61 KA 6925-01: Bridge repair on the Northbound US 169 bridge over the Marais Des Cynges River at Osawatomie. PCI Roads LLC, Saint Michael, Minnesota, $1,468,550.73.
87 N 0753-01: Sidewalk improvements along 63rd and Seneca in Haysville. APAC-Kansas Inc. Shears Division, Hutchinson, $673,188.65.
28 KA 7209-01: Pavement Marking on the Garden City bypass, and on US 50 from the west junction with US 83 west to Holcomb.
83-28 KA 7210-01: Pavement marking on US 83 from 3 miles north of the Haskell/Finney County Line to the south end of the Garden City Bypass.
Roadsafe Traffic Systems Inc., Chicago, Illinois, $1,477,894.38.Non-FA:
10-46 KA 6926-01: repair on Bridge 185 over Cedar Creek (no plans). Comanche Construction Inc., Olathe, $644,999.16.
32-52 KA 6583-01: Bridge Repair on the bridge over Stranger Creek at Linwood. PCI Roads, $436,059.36.
13-75 KA 4594-01: Slide repair near the K-13 bridge over Cedar Creek ~ 4 miles northeast of the Riley/Pottawatomie County Line. Smoky Hill LLC, Salina, Kansas, $594,181.85.
70-105 KA 6767-01: repair the bridge on the I-70 eastbound ramp to/from Park Drive/38th Street. PCI Roads, $133,100.00.
14-62 KA 6949-01: Bridge repair on the bridge over Salt Creek 2.5 miles north of the Lincoln/Mitchell County Line. L & M, $627,960.50.
169-2 KA 6462-01: Guardrail improvements at a culvert northeast of Garnett. J & J Contractors Inc., Iola, $653,424.60.
169B-2 KA 7078-01: 1.5-inch milling and 1.5-inch HMA overlay on US 169B from US 59 to US 169 in Garnett
59-2 KA 7172-01: 1.5-inch milling and 1.5-inch HMA overlay on US 59 from the north junction with US 169 south of Garnett to the North City Limits of Garnett
Bettis Asphalt & Construction Inc., Topeka, $939,710.71.166-10 KA 6464-01: Guardrail improvements on three bridges on US 166 east of Niotaze. J & J Contractors, $1,741,750.68.
166-63 KA 6466-01: Guardrail improvements from 0.21 miles east of 1900 RD to 0.47 miles east of 3950 Road (no plans)
50-78 KA 6757-01: Repair the US 50 bridge over the BNSF La Junta Subdivision in eastern Reno County. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $898,150.94.
83-28 KA 6732-01: Repair the bridge on the Garden City Bypass over US 50 at the southeast junction of US 50 and US 83.
54-60 KA 6956-01: Repair the US 54 bridge over Spring Creek 5 miles west of Meade. PBX Corporation, $847,656.44.
-
KDOT Lettings: January 2024
Awarded bids announced on February 7 are highlighted in red
Federal-Aid:
7-22 KA 5722-01: Replacement of Bridge #016 over Mill Creek on K-7 southeast of White Cloud. One lane of traffic to be maintained, controlled by signals.
52 N 0733-01: Construct new trails along Parallel Road and 158th Street in Baeshor.
52 N 0734-01: Reconstruct 155th Street in Basehor from US 24 to Elm Street, including a roundabout at Parallel.
Miles Excavating, Inc., Basehor, $13,163,024.83.24-81 KA 6851-01: Lighting upgrades at the east junction of US 24 with US 77 east of Riley. Phillips Southern Electric Company Inc., Wichita, Kansas, $65,669.00.
99-99 KA 2603-03: Reconstruction of K-99 from I-70 north 2 miles.Moved to February lettings183Y-26 KA 5608-01: Reconstruction of US 183 Bypass/230th Avenue from Frontier Road to 55th Street, including a new bridge over I-70. Wildcat Construction Co Inc & Subsidiaries, Wichita, $20,914,187.10.
283-98 KA 7171-01: Ultra thin bonded asphalt surface from the Ness/Trego County Line to I-70. Venture Corporation, Great Bend, $3,710,366.70.
27-100 KA 5739-01: Replacement of the North Fork Ladder Creek Bridge (010) located 4.75 miles north of the Wallace/Greeley County Line. King Construction Company Inc & Subsidiaries, Hesston, $3,599,743.21.
160-50 KA 7124-01/160-11 KA 7125-01: Ultra thin bonded asphalt surfacing from the east city limits of Oswego in Labette County to US 69 in Cherokee County (Labette County segment is non-FA) Emery Sapp & Sons Inc. and Subsidiaries, Columbia, Missouri, $2,073,632.10.
54-87 KA 6935-01: Bridge repair on three bridges at the I-135/Kellogg interchange in Wichita: Bridge 303 over Hydraulic on the combined NB/SB ramp from I-135 to WB Kellogg; Bridge 304 over I-135 and the canal on the ramp from EB Kellogg to NB 135; and Bridge 306 over I-135 and the canal on the ramp from WB Kellogg to SB I-135. Wildcat, $1,348,537.60
34-13 KA 5744-01: Replace the K-34 bridge over Bluff Creek north of Sitka. Traffic to be detoured via US 160, US 283, and US 54. L & M Contractors Inc., Great Bend, $3,378,514.55.
Non-FA:
73-52 KA 7131-01: Ultra thin bonded asphalt surface from the Seven Mile Creek bridge in Lancing to the intesection with Limit Street in Leavenworth. Ideker Incorporated, Saint Joseph, Missouri, $2,216,347.57
40B-31 KA 6772-01: Bridge repair on the Smoky Hill River Bridge in Grandview Plaza. PCI Roads, LLC, Saint Michael, Minnesota, $249,240.22.
70-85 KA 7207-01: Full-depth concrete patching on I-70 from Niles Road to the Saline/Dickinson County Line. Interstate Improvement Inc., Faribault, Minnesota, $1,785,494.50.
169-2 KA 7248-01: Crack sealing from ~ 1.5 miles south of the south junction with US 59 northeast of Welda to the roundabout at the north junction with US 59 south of Garnett. Pavement Pro’s LLC, McPherson, $136,072.60.
281-4 KA 6953-01: Bridge repair on bridge #042 over Brush Creek south of Medicine Lodge. Wildcat, $12,182.00.
160-4 KA 6955-01: Bridge repair over Elm Creek east of Medicine Lodge. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $613,128.91.
23-35 KA 7084-01: 1-inch milling and 2-inch HMA overlay from US 56 to Cimarron. Venture, $2,867,507.55.